Hi all,
I have looked at the orbit 0536 ATS file, IBEX_2021_212_o0536a_v001.scr and I approve.
The constraint violations in IBEX_2021_212_o0536a_v001.ccvr are from the removal of the ACT_SetSpinPulseProtectEnable Enable commands and the two transmissions on 2021-08-09 position relative to each other. The violations are acceptable.
The PL commands in IBEX_2021_212_o0536a_v001.scr match those in the STF, IBEX_2021_212_o0536a_v002.stf
Ascending and descending command sequences are consistent with each other, 15 Re ascending, the apogee maneuver time and 15 Re descending as determined from the OEF, IBEX_2021_212_o0536a_v001.oef and as verified with ibex_orbit.
There is 1 star tracker outage this orbit. It begins shortly after the perigee maneuver and lasts for ~1 hour.
The ground station command sequences are correct and the timing and bit rates match those in the contacts file, IBEX_Orbit536_Contacts.txt for all contacts (4).
There is battery balancing this orbit and it is appropriately placed from instrument commands and maneuvers.
The Inertial maneuver at perigee of orbit 0535 left us pointing in safe directions for the orbit 0536 arc A ascending and descending sequences, although it is a bit high:
ibex_rotate -o -u -0.521706,0.78666,0.330136 -w ibex-sun -t 2021/07:31:19:22:40
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI -0.521706,+0.786660,+0.330136
which is R.A. +123.552 Decl. +19.277
missing R.A. +130.915 Decl. +18.118 (ibex-sun)
error is R.A. +7.363 Decl. +1.159
for a total 7.069 deg
ibex_rotate -o -u -0.521706,0.78666,0.330136 -w ibex-sun -t 2021/08:04:11:44:56
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI -0.521706,+0.786660,+0.330136
which is R.A. +123.552 Decl. +19.277
missing R.A. +134.410 Decl. +17.214 (ibex-sun)
error is R.A. +10.858 Decl. +2.063
for a total 10.514 deg
The inertial precession maneuver at apogee leaves us pointing in safe directions at the time of the maneuver and for arc B ascending and descending sequences:
ibex_rotate -o -u -0.644305,0.705579,0.295008 -w ibex-sun -t 2021/08:04:13:28:04
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI -0.644305,+0.705579,+0.295008
which is R.A. +132.401 Decl. +17.158
missing R.A. +134.480 Decl. +17.195 (ibex-sun)
error is R.A. +2.079 Decl. +0.037
for a total 1.986 deg
ibex_rotate -o -u -0.644305,0.705579,0.295008 -w ibex-sun -t 2021/08:04:15:03:10
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI -0.644305,+0.705579,+0.295008
which is R.A. +132.401 Decl. +17.158
missing R.A. +134.544 Decl. +17.178 (ibex-sun)
error is R.A. +2.143 Decl. +0.020
for a total 2.048 deg
ibex_rotate -o -u -0.644305,0.705579,0.295008 -w ibex-sun -t 2021/08:09:03:42:37
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI -0.644305,+0.705579,+0.295008
which is R.A. +132.401 Decl. +17.158
missing R.A. +138.993 Decl. +15.891 (ibex-sun)
error is R.A. +6.592 Decl. +1.267
for a total 6.445 deg
The inertial precession maneuver at perigee leaves us pointing in safe directions at the time of the maneuver and at orbit 0537 apogee:
ibex_rotate -o -u -0.701673,0.657234,0.275134 -w ibex-sun -t 2021/08:09:07:17:43
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI -0.701673,+0.657234,+0.275134
which is R.A. +136.873 Decl. +15.970
missing R.A. +139.131 Decl. +15.843 (ibex-sun)
error is R.A. +2.258 Decl. +0.127
for a total 2.175 deg
ibex_rotate -o -u -0.701673,0.657234,0.275134 -w ibex-sun -t 2021-08-14T00:31:06
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI -0.701673,+0.657234,+0.275134
which is R.A. +136.873 Decl. +15.970
missing R.A. +143.477 Decl. +14.481 (ibex-sun)
error is R.A. +6.604 Decl. +1.489
for a total 6.543 deg
The set science state commands overlap with a contact in the orbit 0535 commands, but this is acceptable.
Command Approval Checklist is attached.
Carol
--
Carol Weaver
University of New Hampshire
503.902.8492
From:
Perry, Timothy E [US] (SP) <Timothy.Perry@ngc.com>
Date: Tuesday, 2021-July-20 at 16:47
To: Carol Weaver <Carol.Weaver@unh.edu>, Chubin, Eric [US] (SP) <Eric.Chubin@ngc.com>, David Heirtzler <David.Heirtzler@unh.edu>, ADS-IBEX@l3harris.com <ADS-IBEX@l3harris.com>, IBEXOPS@gmail.com <IBEXOPS@gmail.com>, isocops@lists.sr.unh.edu <isocops@lists.sr.unh.edu>,
fair-play@comcast.net <fair-play@comcast.net>, kwfairchild@gmail.com <kwfairchild@gmail.com>, Kenneth Fairchild <Ken.Fairchild@unh.edu>, angoldconsulting@earthlink.net <angoldconsulting@earthlink.net>, Paul.Janzen@mso.umt.edu <Paul.Janzen@mso.umt.edu>, Perry,
Timothy E [US] (SP) <Timothy.Perry@ngc.com>, Tyler, Ryan S [US] (SP) <Ryan.Tyler@ngc.com>, Wesley, Sheral R [US] (SP) <Sheral.Wesley@ngc.com>, Wynn, Reese [US] (SP) <Reese.Wynn@ngc.com>
Subject: IBEX Orbit #536 ATS Approval (31 July – 09 Aug, 2021)
Caution - External Email
All,
Attached are the planning files for Orbit #536. Please respond to this thread with comments and approvals. Sorry for the late delivery of the orbit 536 planning products. We had some license issues with our STK. Approvals are requested
by 21:00, 21 July 2021.
Note: We do have a couple more contacts before the start of Orbit 536, If you are unable to get the approvals done by tomorrow afternoon.
Please note the following:
Begin 2021/08:09:13:00:00 – End 2021/08:09:14:30:00
Just a reminder for the APL contact. We start off at 2k D\L, after 5 minutes we switch to 320k D\L, Then 5 minutes later we start the SSR Dump with Dump New command
IBEX_2021_212_o0536a_v001.ccvr
# Input files: 1
# IBEX_2021_212_o0536a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
These 2 IBX-CLC-006 Soft Violations are acceptable. The reason for these violations are because of the 2 following contacts:
IBEX,APL-18,ADD,2021-08-09,221,15:00:00,2021-08-09,221,16:00:00,, LAHO 2K-320k APL Orbit# 536 SSR_Dump Contact 14 Per
IBEX,USHI01,ADD,08/09/21,221,19:00:00,08/09/21,221,20:00:00,LAHO 2K IBEX-2 Orbit# 536 Tracking Contact 14 Asc
IBX-CLC-006: Planned transmission at 2021/08/09 14:58:00 UTC - 2021/08/09
16:02:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2021/08/09 18:58:00 UTC - 2021/08/09
20:02:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds.
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/07/31 16:43:51 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/08/04 14:33:10 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430