All,
Attached are the planning files for Orbit #531. Please respond to this thread with comments and approvals.
We will manually reset the master timer at PERIGEE starting with Orbit# 531.
Approvals are required by COB on 5 June 2021.
Please note the following:
1. The ATS file has been changed to a word file and encrypted. I will send out another email with the password. The files that have been transferred via MFT have not been encrypted and are still text files.
2. PERIGEE Sun Maneuver
2021-06-24T17:23:27.000Z,SunMvrBegin
2021-06-24T17:38:27.000Z,SunMvrEnd
3. Battery Balancing this orbit
Orbit# 531 PERIGEE Battery Balancing Commands
# 2021-06-25T00:00:13.964Z,Perigee,orbit:531
SetLongEclipseFlag TRUE $TIME=2021/06:25:01:00:00
SetLongEclipseFlag FALSE $TIME=2021/06:25:02:30:00
4. Command Load Constraint Violation Report (CCVR)
# Filename: IBEX_2021_166_o0531a_v001.ccvr
# File type: Command Load Constraint Violation Report (CCVR)
#
# Create time: 2021/153.204146
# Plan period start: 2021/167.031800
# Plan period stop: 2021/176.071200
# Default time format: UTC
#
# Input files: 1
# IBEX_2021_166_o0531a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/06/16 03:20:29 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/06/20 01:56:43 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral Wesley |
Sr Principal Engineer, Satellite Systems
Northrop Grumman Corporation | Space Systems
O: 703-406-5641 | C: 202-236-0802 |
sheral.wesley@ngc.com