Hi all,
I have looked at the orbit 0529 ATS files, IBEX_2021_148_o0529a_BUS_v001.scr, IBEX_2021_148_o0529a_INST_v001.scr and I approve.
The constraint violations in IBEX_2021_148_o0529a_BUS_v001.ccvr and IBEX_2021_148_o0529a_INST_v001.ccvr are from the removal of the ACT_SetSpinPulseProtectEnable Enable commands. The violations are acceptable.
The PL commands in IBEX_2021_148_o0529a_INST_v001.scr match those in the STF, IBEX_2021_148_o0529a_v002.stf
Ascending and descending command sequences are consistent with each other, 15 Re ascending, the apogee maneuver time and 15 Re descending as determined from the OEF, IBEX_2021_148_o0529a_BUS_v001.oef and as verified with ibex_orbit.
There is 1 star tracker outage this orbit. Outage lasts for ~10 hours and ends ~45 minutes before perigee maneuver.
The ground station command sequences are correct and the timing and bit rates match those in the contacts file, IBEX_Orbit529_Contacts.txt for all contacts (4).
No Battery Balancing this orbit
The Inertial maneuver at perigee of orbit 0528 left us pointing in safe directions for the orbit 0529 arc A ascending and descending sequences:
ibex_rotate -o -u 0.426961,0.833207,0.351384 -w ibex-sun -t 2021/05:28:17:40:57
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI +0.426961,+0.833207,+0.351384
which is R.A. +62.868 Decl. +20.572
missing R.A. +65.480 Decl. +21.505 (ibex-sun)
error is R.A. +2.612 Decl. +0.933
for a total 2.610 deg
ibex_rotate -o -u 0.426961,0.833207,0.351384 -w ibex-sun -t 2021/06:01:11:21:56
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI +0.426961,+0.833207,+0.351384
which is R.A. +62.868 Decl. +20.572
missing R.A. +69.341 Decl. +22.082 (ibex-sun)
error is R.A. +6.473 Decl. +1.510
for a total 6.215 deg
The inertial precession maneuver at apogee leaves us pointing in safe directions at the time of the maneuver and for arc B ascending and descending sequences:
ibex_rotate -o -u 0.357707,0.860733,0.362194 -w ibex-sun -t 2021/06:01:13:05:04
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI +0.357707,+0.860733,+0.362194
which is R.A. +67.433 Decl. +21.235
missing R.A. +69.416 Decl. +22.093 (ibex-sun)
error is R.A. +1.983 Decl. +0.858
for a total 2.033 deg
ibex_rotate -o -u 0.357707,0.860733,0.362194 -w ibex-sun -t 2021/06:01:14:40:10
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI +0.357707,+0.860733,+0.362194
which is R.A. +67.433 Decl. +21.235
missing R.A. +69.485 Decl. +22.103 (ibex-sun)
error is R.A. +2.052 Decl. +0.868
for a total 2.095 deg
ibex_rotate -o -u 0.357707,0.860733,0.362194 -w ibex-sun -t 2021/06:06:03:32:33
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI +0.357707,+0.860733,+0.362194
which is R.A. +67.433 Decl. +21.235
missing R.A. +74.144 Decl. +22.650 (ibex-sun)
error is R.A. +6.711 Decl. +1.415
for a total 6.383 deg
The inertial precession maneuver at perigee leaves us pointing in safe directions at the time of the maneuver and at orbit 0530 apogee:
ibex_rotate -o -u 0.283804,0.883311,0.373117 -w ibex-sun -t 2021/06:06:15:22:11
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI +0.283804,+0.883311,+0.373117
which is R.A. +72.188 Decl. +21.908
missing R.A. +74.619 Decl. +22.675 (ibex-sun)
error is R.A. +2.431 Decl. +0.767
for a total 2.377 deg
ibex_rotate -o -u 0.283804,0.883311,0.373117 -w ibex-sun -t 2021-06-11T04:59:02
Quaternion +0.000000,+0.000000,+0.000000,+0.000000
points axis +1.000000,+0.000000,+0.000000
towards ECI +0.283804,+0.883311,+0.373117
which is R.A. +72.188 Decl. +21.908
missing R.A. +79.370 Decl. +23.089 (ibex-sun)
error is R.A. +7.182 Decl. +1.181
for a total 6.739 deg
There is no overlap with orbit 0528 commands.
Command Approval Checklist is attached.
Carol
--
Carol Weaver
University of New Hampshire
503.902.8492
From:
Wesley, Sheral R [US] (SP) <Sheral.Wesley@ngc.com>
Date: Friday, 2021-May-14 at 17:40
To: Weaver, Carol <carol.weaver@unh.edu>, Chubin, Eric [US] (SP) <Eric.Chubin@ngc.com>, Heirtzler, David <David.Heirtzler@unh.edu>, ADS-IBEX@l3harris.com <ADS-IBEX@l3harris.com>, IBEXOPS@gmail.com <IBEXOPS@gmail.com>, isocops@lists.sr.unh.edu <isocops@lists.sr.unh.edu>,
fair-play@comcast.net <fair-play@comcast.net>, kwfairchild@gmail.com <kwfairchild@gmail.com>, Fairchild, Kenneth <Ken.Fairchild@unh.edu>, angoldconsulting@earthlink.net <angoldconsulting@earthlink.net>, Paul.Janzen@mso.umt.edu <Paul.Janzen@mso.umt.edu>, Perry,
Timothy E [US] (SP) <Timothy.Perry@ngc.com>, Tyler, Ryan S [US] (SP) <Ryan.Tyler@ngc.com>, Wesley, Sheral R [US] (SP) <Sheral.Wesley@ngc.com>, Wynn, Reese [US] (SP) <Reese.Wynn@ngc.com>
Subject: IBEX Orbit #529 ATS Approval (28 May - 06 June, 2021)
Caution - External Email
All,
Attached are the planning files for Orbit #529. Please respond to this thread with comments and approvals.
Approvals are required by COB on 17 May 2021.
Please note the following:
None
Just a reminder for the APL contact. We start off at 2k D\L, after 5 minutes we switch to 320k D\L, Then 5 minutes later we start the SSR Dump with Dump New command
Filename: IBEX_2021_148_o0529a_v001.ccvr
# File type: Command Load Constraint Violation Report (CCVR)
#
# Create time: 2021/134.182455
# Plan period start: 2021/148.030000
# Plan period stop: 2021/157.215500
# Default time format: UTC
#
# Input files: 1
# IBEX_2021_148_o0529a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/05/28 14:41:44 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/06/01 14:10:10 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral Wesley |
Principal Engineer, Satellite Systems
Northrop Grumman Corporation | Space Systems
O: 703-406-5641 | C: 202-236-0802 |
sheral.wesley@ngc.com