All,
Attached are the planning files for Orbit #522
Please respond to this thread with comments and approvals.
Approvals are required by COB on 14 March 2021
Please note the following:
Begin 2021/04:03:00:30:00 – End 2021/04:03:02:00:00
5.
# Orbit# 520 Reset Master Timer - 2021/03:16:04:15:00
6.
Command Load Constraint Violation Report (CCVR)
IBEX_2021_083_o0522a_v001.ccvr
# Input files: 1
# IBEX_2021_083_o0522a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
The 2 IBX-CLC-006 violations are acceptable
IBX-CLC-006: Planned transmission at 2021/04/02 23:03:00 UTC - 2021/04/03
00:07:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2021/04/03 02:28:00 UTC - 2021/04/03
03:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/03/25 05:28:56 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/03/29 02:21:40 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430