All,
Attached are the planning files for Orbit #517
Please respond to this thread with comments and approvals.
Approvals are required by COB on 28 January 2021
Please note the following:
6.
# Orbit# 515 Master Timer Reset - 2021/01:29:02:15:00
7.
Command Load Constraint Violation Report (CCVR)
The 2 IBX-CLC-006 Soft constraint violations are acceptable. The reason for the violations is that the 2 contacts are separated by 1 hour.
IBEX,AUWA01,ADD,02/16/21,047,13:00:00,02/16/21,047,14:30:00,LAHO 160K IBEX-2 Orbit# 517 Star Tracker Dump/Tracking Contact 14 Per Asc
IBEX,AUWA01,ADD,02/16/21,047,15:30:00,02/16/21,047,16:30:00,LAHO 160K IBEX-2 Orbit# 517 SSR_Dump/Tracking Contact 14.5 Asc
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2021/02/16 12:58:00 UTC - 2021/02/16
14:32:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-006: Planned transmission at 2021/02/16 15:28:00 UTC - 2021/02/16
16:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 9480.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/02/07 17:18:48 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2021/02/11 22:30:11 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430