Hi all,

 

I approve IBEX_2020_332_o0509a_INST_v001.scr, IBEX_2020_332_o0509a_BUS_v001.scr

 

Constraint violations IBEX_2020_332_o0509a_BUS_v001.ccvr, IBEX_2020_332_o0509a_INST_v001.ccvr have the 2 expected violations from removal of  ACT_SetSpinPulseProtectEnable as well  as 2 violations about commanding windows being too close together. The time between command contacts is sufficient to allow transmitter to cool down.

 

PL commands in IBEX_2020_332_o0509a_INST_v001.scr match those in IBEX_2020_332_o0509a_v002.stf

 

Star Tracker Outage: 1 outage that occurs before the 509 apogee maneuver and lasts for ~1 hour. The apogee maneuver is after the star tracker turns back on.

 

The ground station command sequences are correct and the timing and bit rates match those in the contacts file, IBEX_Orbit509_Contacts.txt for the (4) contacts.

 

We are doing battery cell balancing and the commands are correct and timed appropriately.

 

The inertial maneuver at perigee of 508 left us pointing in a safe direction for the orbit 509 arc A ascending and descending sequences:

ibex_rotate -o -u -0.452865,-0.814406,-0.362845 -w ibex-sun -t 2020/11:28:01:59:13

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

 points axis  +1.000000,+0.000000,+0.000000

 towards ECI  -0.452865,-0.814406,-0.362845

 which is     R.A. +240.923 Decl. -21.275

 missing      R.A. +244.157 Decl. -21.335 (ibex-sun)

 error is     R.A.   +3.234 Decl.  +0.060

 for a total  3.013 deg

 

ibex_rotate -o -u -0.452865,-0.814406,-0.362845 -w ibex-sun -t 2020/12:02:08:00:27

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

 points axis  +1.000000,+0.000000,+0.000000

 towards ECI  -0.452865,-0.814406,-0.362845

 which is     R.A. +240.923 Decl. -21.275

 missing      R.A. +248.655 Decl. -21.974 (ibex-sun)

 error is     R.A.   +7.732 Decl.  +0.699

 for a total  7.220 deg

 

The inertial precession maneuver at apogee leaves us pointing in safe directions at the time of the maneuver and for arc B ascending and descending sequences:

ibex_rotate -o -u -0.349453,-0.855795,-0.381441 -w ibex-sun -t 2020/12:02:09:43:32

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

 points axis  +1.000000,+0.000000,+0.000000

 towards ECI  -0.349453,-0.855795,-0.381441

 which is     R.A. +247.788 Decl. -22.423

 missing      R.A. +248.731 Decl. -21.983 (ibex-sun)

 error is     R.A.   +0.943 Decl.  +0.440

 for a total  0.978 deg

 

ibex_rotate -o -u -0.349453,-0.855795,-0.381441 -w ibex-sun -t 2020/12:02:11:18:41

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

 points axis  +1.000000,+0.000000,+0.000000

 towards ECI  -0.349453,-0.855795,-0.381441

 which is     R.A. +247.788 Decl. -22.423

 missing      R.A. +248.801 Decl. -21.991 (ibex-sun)

 error is     R.A.   +1.013 Decl.  +0.432

 for a total  1.033 deg

 

ibex_rotate -o -u -0.349453,-0.855795,-0.381441 -w ibex-sun -t 2020/12:06:06:54:20

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

 points axis  +1.000000,+0.000000,+0.000000

 towards ECI  -0.349453,-0.855795,-0.381441

 which is     R.A. +247.788 Decl. -22.423

 missing      R.A. +252.976 Decl. -22.496 (ibex-sun)

 error is     R.A.   +5.188 Decl.  +0.073

 for a total  4.795 deg

 

The inertial precession maneuver at perigee leaves us pointing in safe directions at the time of the maneuver and at orbit 510 apogee:

ibex_rotate -o -u -0.243102,-0.885897,-0.395081 -w ibex-sun -t 2020/12:06:09:50:28

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

 points axis  +1.000000,+0.000000,+0.000000

 towards ECI  -0.243102,-0.885897,-0.395081

 which is     R.A. +254.655 Decl. -23.271

 missing      R.A. +253.117 Decl. -22.517 (ibex-sun)

 error is     R.A.   +1.538 Decl.  +0.754

 for a total  1.605 deg

 

ibex_rotate -o -u -0.243102,-0.885897,-0.395081 -w ibex-sun -t 2020/12:11:04:31:16

Quaternion    +0.000000,+0.000000,+0.000000,+0.000000

 points axis  +1.000000,+0.000000,+0.000000

 towards ECI  -0.243102,-0.885897,-0.395081

 which is     R.A. +254.655 Decl. -23.271

 missing      R.A. +258.343 Decl. -22.992 (ibex-sun)

 error is     R.A.   +3.688 Decl.  +0.279

 for a total  3.403 deg

 

The two commands to move into science state and Lo background mode are overlapping commands with commands from prior orbit at http://ibex.unh.edu/cgi-bin/ats.cgi. This is acceptable.

 

Command Approval Checklist is attached.

 

Thanks,

Carol

 

 

-- 

Carol Weaver

University of New Hampshire

503.902.8492

 

From: Perry, Timothy E [US] (IS) <Timothy.Perry@ngc.com>
Date: Thursday, 2020-November-12 at 15:15
To: Weaver, Carol <Carol.Weaver@unh.edu>, Chubin, Eric [US] (IS) <Eric.Chubin@ngc.com>, Heirtzler, David <David.Heirtzler@unh.edu>, IBEX FDG (IBEX@applieddefense.info) <IBEX@applieddefense.info>, IBEXOPS <IBEXOPS@gmail.com>, ISOC <isocops@lists.sr.unh.edu>, Ken Fairchild <fair-play@comcast.net>, Ken Fairchild (kwfairchild@gmail.com) <kwfairchild@gmail.com>, Nigel Angold <angoldconsulting@earthlink.net>, Paul Janzen <Paul.Janzen@mso.umt.edu>, Perry, Timothy E [US] (IS) <Timothy.Perry@ngc.com>, Tyler, Ryan S [US] (IS) <Ryan.Tyler@ngc.com>, Wesley, Sheral R [US] (IS) <Sheral.Wesley@ngc.com>, Wynn, Reese [US] (IS) <Reese.Wynn@ngc.com>
Subject: IBEX Orbit #509 ATS Approval (28 Nov 20 - 7 Dec 20)

Caution - External Email

All,

   Attached are the planning files for Orbit #509

Please respond to this thread with comments and approvals.  

Approvals are required by COB on 15 November 2020

 

Please note the following:

  1. I generated 3 separate ATS files BUS, INST and a complete file. The BUS and INST will be the files to be uplinked. The complete ATS, I used as a sanity check to see how the commands lined up. Since we are in a new phase of ATS generation. IF you have any ideas of doing this differently, let me know.

 

  1. The 3 ATS files have been changed to word files and encrypted. I will send out another email with the password. The files that have been transferred via MFT have not been encrypted and are still text files.  

 

  1. I moved the 2 House Keeping commands from the INST ATS to the BUS ATS. I commented out the 2 commands in the INST ATS. If for some reason we were unable to uplink the INST Commands for this orbit, we would have been in the wrong spacecraft state for executing the maneuver commands.

 

  1. To reduce the number hand edits in an ATS. I am incorporating the use of an ABS file for inserting both battery balancing and 18 day timer reset commands.

 

  1. Battery Balancing this orbit

# Orbit 509 Battery Balancing

# 2020-12-06T17:31:16.958Z,Perigee,orbit:509 

Begin 2020/12:06:17:00:00 – End 2020/12:06:18:30:00

 

  1. # Orbit# 507 Reset Master Timer  2020/11:19:00:15:00

 

  1. Command Load Constraint Violation Report (CCVR)

The 2 IBX-CLC-006 Soft constraint violations are because the following contacts closer than 5 hours in separation. This is acceptable since there is 1.5 hour separation between the 2 contacts and power and temperature will not be an issue.

IBEX,USHI01,ADD,12/06/20,341,05:30:00,12/06/20,341,06:30:00,LAHO 64K IBEX-2 Orbit# 509 Lo ISN Sweep Begin Contact 15.5 Desc

IBEX,USHI01,ADD,12/06/20,341,08:00:00,12/06/20,341,09:00:00,LAHO 160K IBEX-2 Orbit# 509 SSR_Dump/Tracking Contact 14 Desc

IBEX_2020_332_o0509a_v001.ccvr

# Input files:         1

#   IBEX_2020_332_o0509a_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-006: Planned transmission at 2020/12/06 05:28:00 UTC - 2020/12/06

             06:32:00 UTC is followed by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 7680.000 seconds)

IBX-CLC-006: Planned transmission at 2020/12/06 07:58:00 UTC - 2020/12/06

             09:02:00 UTC is preceded by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 7680.000 seconds)

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2020/11/27 23:40:32 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2020/12/02 10:48:41 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

Timothy E.Perry