All,
The SSC AUWA01 and USAK01 contacts were nominal for CMD & TLM. The Inertial maneuver was successful. The Orbit 505 Bus and Instrument ATS’s were uplinked and the command count
at LOS was 232. The 18 Day timer command executed nominally and the timer was set back to 10.The APL-18 contact was not successful. We will need to redump the Orbit 503 SSR data on the 504 perigee passes. Both are scheduled @160k.
Razor #I100-674 – APL-18 Failed Acq 13 Oct 2020 @04:00
Tasks Accomplished:
CAR # 1125 - ATS Upload
IBEX_2020_296_o0505a_BUS-V001 31 Cmds
IBEX_2020_296_o0505a_INST-V001 46 Cmds
Dump FC Back Orbit Data
Reset FDC Totals
Set Spacecraft Clock
Results from the Inertial Maneuver:
Q1 0.28624500 ActNor.EstInrToBdy[0]
Q2 -0.69201600 ActNor.EstInrToBdy[1]
Q3 -0.07078200 ActNor.EstInrToBdy[2]
Q4 0.65891400 ActNor.EstInrToBdy[3]
GPS sec 1286632867 ActNor.EstTime
UTC time
10/13/2020 14:00:53 output
MPS Cmd Vector X -0.951569000
MPS Cmd Vector Y -0.278384000
MPS Cmd Vector Z -0.130457000
CSS Angle TLM 0.0791294
CSS Sun-Pointing Angle 0.1582588
08 Oct 20 @ 23:30:00
CSS Angle TLM 0.289391
CSS Sun-Pointing Angle 0.578782
13 Oct 20 @ 14:00:00
Pre-Burn
Thruster 1 5408 08 Oct 20 @ 23:30:00
Thruster 2 5280
Thruster 3 6432
Thruster 4 6560
Post-Burn
`
Thruster 1 5728 13 Oct 20 @ 14:00:00
Thruster 2 5552
Thruster 3 6720
Thruster 4 6896
Number of Pulses
Thruster 1 320
Thruster 2 272
Thruster 3 288
Thruster 4 336
Thruster Pairs
Thruster 1 & 2 592
Thruster 3 & 4 624
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430