All,
Attached are the Orbit 496 ATS files with the corrected names. The files have also been placed on the MFT server.
Tim
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430
From: Perry, Timothy E [US] (IS)
Sent: Thursday, July 16, 2020 4:21 PM
To: 'carol.weaver@unh.edu' <carol.weaver@unh.edu>; Chubin, Eric [US] (IS) <Eric.Chubin@ngc.com>; 'David Heirtzler' <David.Heirtzler@unh.edu>; 'IBEX FDG' <IBEX@applieddefense.info>; 'IBEXOPS' <IBEXOPS@gmail.com>; 'ISOC' <isocops@lists.sr.unh.edu>; 'Ken
Fairchild' <fair-play@comcast.net>; 'Ken Fairchild (kwfairchild@gmail.com)' <kwfairchild@gmail.com>; 'Nigel Angold' <nigel.angold@nasa.gov>; 'Nigel Angold' <angoldconsulting@earthlink.net>; 'Paul Janzen' <paul.janzen@umontana.edu>; Perry, Timothy E [US] (IS)
<Timothy.Perry@ngc.com>; Tyler, Ryan S [US] (IS) <Ryan.Tyler@ngc.com>; Wesley, Sheral R [US] (IS) <Sheral.Wesley@ngc.com>; Wynn, Reese [US] (IS) <Reese.Wynn@ngc.com>
Subject: IBEX Orbit #496 ATS Approval ( 31 July – 9 Aug 2020 )
All,
Attached are the planning files for Orbit #496
Please respond to this thread with comments and approvals.
Approvals are required by COB on 20 July 2020
Please note the following:
No Battery Balancing this orbit
5.
Orbit# 494 Reset Master Timer command
The Master Timer Reset Command is set for 2020/07:22:08:45:00. This command will execute on the following contact for Orbit 494
IBEX,USAK01,ADD,07/22/20,204,08:00:00,07/22/20,204,09:00:00,LAHO 160K IBEX-2 Orbit# 494 SSR_Dump/Tracking Contact 13 asc
6.
APL Contact
Just a reminder for the APL contact. We start off at 2k D\L, after 5 minutes we switch to 320k D\L, Then 5 minutes later we start the SSR Dump With Dump
IBEX,APL-18,ADD,2020-08-09,222,14:00:00,2020-08-09,222,15:00:00,, LAHO 2K-360k Orbit# 496 SSR_Dump Contact Perigee
7.
Command Load Constraint Violation Report (CCVR)
IBEX_2020_213_o0496a_v001.ccvr
We have 2 IBX-CLC-006 Soft Constraint violations. The reason it that there are 2 contacts that are separated by 4 hours and the limit is 5 hours between contacts. These are acceptable,
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2020/08/09 13:58:00 UTC - 2020/08/09
15:02:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2020/08/09 18:58:00 UTC - 2020/08/09
20:02:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 7680.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2020/07/31 15:26:46 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2020/08/04 14:38:40 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
Office (703) 406-5976
Cell (301) 606-1430