All,
Attached are the planning files for Orbit #481
Please respond to this thread with comments and approvals.
Approvals are required by COB on 8 Mar 2020
Please note the following:
2.
Command Load Constraint Violation Report (CCVR)
IBEX_2020_078_o0481a_v001_.ccvr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
These 2 IBX-CLC-006 soft violations are acceptable. The 2 contacts are as follows:
USAK01,03/18/20,078,15:00:00,03/18/20,078,16:00:00, 160K IBEX-3 Orbit# 480 SSR_Dump/Tracking Contact 14re Asc
USAK01,03/18/20,078,19:00:00,03/18/20,078,20:00:00, 40K IBEX-3 Orbit# 481 HI BK Grnd Test 15.5re Asc Begin
The is a 3 hour gap between the 2 contacts. This will give the transmitters plenty of time to cool down. Also, the transmitter temp is a point that we routinely monitor.
IBX-CLC-006: Planned transmission at 2020/03/18 15:50:00 UTC - 2020/03/18
18:58:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-006: Planned transmission at 2020/03/18 18:58:00 UTC - 2020/03/18
20:02:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 15120.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2020/03/18 15:53:09 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2020/03/22 10:12:29 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430