On January 9, 2020 at 12:22 PM "Perry, Timothy E [US] (IS)" <Timothy.Perry@ngc.com> wrote:
All,
Attached are the planning files for Orbit #475
Please respond to this thread with comments and approvals.
Approvals are required by COB on 13 Jan 2020.
Please note the following:
1. No Battery Balancing
2. Command Load Constraint Violation Report (CCVR)
The 2 IBX-CLC-006 constraint violations are acceptable. This is because 2 contacts have been scheduled within in a 5 hour period.
IBEX,AUWA01,ADD,01/23/20,023,19:00:00,01/23/20,023,20:00:00,,LAHO 160K Orbit# 474 SSR_Dump/Tracking Contact 13.5re Asc
IBEX,USAK01,ADD,01/23/20,023,23:30:00,01/24/20,024,00:30:00,LAHO 160K IBEX-3 Orbit# 475 Lo Normal Sweep 16re ASC
IBEX_2020_023_o0475a_v001_.ccvr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2020/01/23 20:00:00 UTC - 2020/01/23
23:28:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-006: Planned transmission at 2020/01/23 23:28:00 UTC - 2020/01/24
00:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 16320.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2020/01/23 20:01:23 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2020/01/27 09:45:36 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430