1.       No Battery Balancing

 

2.       Command Load Constraint Violation Report (CCVR)

 

               The 2 IBX-CLC-006 constraint violations are acceptable. This is because  2 contacts have been scheduled within in a 5 hour period.

IBEX,AUWA01,ADD,01/23/20,023,19:00:00,01/23/20,023,20:00:00,,LAHO 160K Orbit# 474 SSR_Dump/Tracking Contact 13.5re Asc

IBEX,USAK01,ADD,01/23/20,023,23:30:00,01/24/20,024,00:30:00,LAHO 160K IBEX-3 Orbit# 475 Lo Normal Sweep 16re ASC

 

IBEX_2020_023_o0475a_v001_.ccvr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-006: Planned transmission at 2020/01/23 20:00:00 UTC - 2020/01/23

             23:28:00 UTC exceeds the maximum contiguous transmission time of

             5400 seconds

IBX-CLC-006: Planned transmission at 2020/01/23 23:28:00 UTC - 2020/01/24

             00:32:00 UTC is preceded by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 16320.000 seconds)

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2020/01/23 20:01:23 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2020/01/27 09:45:36 UTC

 

==============

OTHER MESSAGES

==============