All,

   Attached are the planning files for Orbit #470

Please respond to this thread with comments and approvals.  

Approvals are required by COB on 27 Nov 2019

 

Please note the following:

1.       No Battery Balancing

 

2.       Star Tracker Image  Dump

·         USHI01 12/17/19,351,12:00:00 - 12/17/19,351,13:30:00,LAHO 160K IBEX-2 Orbit# 470 Star Tracker Image Dump

 

3.       Command Load Constraint Violation Report (CCVR)

IBX-CLC-006 Violation is acceptable. The time between supports is 6 hours. There should be no issue with transmitter temp.

 

IBEX_2019_341_o0470a_v001.ccvr

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-006: Planned transmission at 2019/12/17 11:58:00 UTC - 2019/12/17

             13:32:00 UTC exceeds the maximum contiguous transmission time of

             5400 seconds

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2019/12/08 06:22:46 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2019/12/13 12:04:41 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

Cell (301) 606-1430

 

cid:image001.png@01D542D6.6047A400