All,
Attached are the planning files for Orbit #470
Please respond to this thread with comments and approvals.
Approvals are required by COB on 27 Nov 2019
Please note the following:
1.
No Battery Balancing
2.
Star Tracker Image Dump
·
USHI01 12/17/19,351,12:00:00 - 12/17/19,351,13:30:00,LAHO 160K IBEX-2 Orbit# 470 Star Tracker Image Dump
3.
Command Load Constraint Violation Report (CCVR)
IBX-CLC-006 Violation is acceptable. The time between supports is 6 hours. There should be no issue with transmitter temp.
IBEX_2019_341_o0470a_v001.ccvr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2019/12/17 11:58:00 UTC - 2019/12/17
13:32:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2019/12/08 06:22:46 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2019/12/13 12:04:41 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry@ngc.com
Office (703) 406-5976
Cell (301) 606-1430