All,
Attached are the planning files for Orbit #469
Please respond to this thread with comments and approvals.
Approvals are required by COB on 18 Nov 2019
Please note the following:
1.
# Orbit 469 Battery Balancing
# 2019-12-07T23:43:45.916Z,Perigee,orbit:469
@ECT_SetLongEclipseFlag TRUE $TIME=2019/12:07:23:00:00
@ECT_SetLongEclipseFlag FALSE $TIME=2019/12:08:00:30:00
2.
Command Load Constraint Violation Report (CCVR)
The 2 IBX-CLC-006 Soft violations is because we have the 2 contacts that are separated by 4.5 hours. This should not be a problem.
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2019/12/07 11:58:00 UTC - 2019/12/07
13:02:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 5880.000 seconds)
IBX-CLC-006: Planned transmission at 2019/12/07 17:28:00 UTC - 2019/12/07
18:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 5880.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2019/11/29 01:40:15 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2019/12/03 00:10:29 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.