All,

   Attached are the planning files for Orbit #469

Please respond to this thread with comments and approvals.  

Approvals are required by COB on 18 Nov 2019

 

Please note the following:

1.       # Orbit 469 Battery Balancing 

# 2019-12-07T23:43:45.916Z,Perigee,orbit:469

 @ECT_SetLongEclipseFlag TRUE $TIME=2019/12:07:23:00:00

@ECT_SetLongEclipseFlag FALSE $TIME=2019/12:08:00:30:00

 

2.       Command Load Constraint Violation Report (CCVR)

The 2 IBX-CLC-006 Soft violations is because we have the 2 contacts that are separated by 4.5 hours. This should not be a problem.

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-006: Planned transmission at 2019/12/07 11:58:00 UTC - 2019/12/07

             13:02:00 UTC is followed by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 5880.000 seconds)

IBX-CLC-006: Planned transmission at 2019/12/07 17:28:00 UTC - 2019/12/07

             18:32:00 UTC is preceded by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 5880.000 seconds)

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2019/11/29 01:40:15 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2019/12/03 00:10:29 UTC

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

Timothy E.Perry

CRS IBEX OCO-2

Mission Operations

timothy.perry@ngc.com

Office (703) 406-5976

Cell (301) 606-1430

 

cid:image001.png@01D542D6.6047A400