All,
The pass was mostly nominal for CMD and TLM. The Inertial maneuver was successful. There were a few minutes of TLM/CMD outage between 14:07z and 14:11z on August 3 at USAK01. This was caused by a loss of communication between SSC and the
station. MOC was already finished with the SSR dump at this time so there were no impacts to the downlink. SSC will issue a PR due to the loss of communication.
The following was completed:
August 2
Reset Master Timer
CAR #1052 Orbit #457 ATS, Uplinked 93 commands
August 3
SSR Dump New and Reset Pointer
Results from the maneuver:
Q1 -0.14599700 ActNor.EstInrToBdy[0]
Q2 -0.56700800 ActNor.EstInrToBdy[1]
Q3 -0.46869000 ActNor.EstInrToBdy[2]
Q4 0.66145000 ActNor.EstInrToBdy[3]
GPS sec 1248874554 ActNor.EstTime
UTC time 08/03/2019 13:35:40 output
MPS Diff 0.684 deg
MPS Cmd Vector X -0.619179000
MPS Cmd Vector Y 0.724018000
MPS Cmd Vector Z 0.304000000
CSS Angle TLM 0.569239
CSS Sun-Pointing Angle 1.138478
30 July 19 @ 12:00
CSS Angle TLM 0.407824
CSS Sun-Pointing Angle 0.815648
03 Aug 19 @ 13:30
Pre-Burn
Thruster 1 15440 30 July 19 @ 12:00
Thruster 2 15056
Thruster 3 18368
Thruster 4 18752
Post-Burn
Thruster 1 15696 03 Aug 19 @ 13:30
Thruster 2 15312
Thruster 3 18640
Thruster 4 19024
Number of Pulses
Thruster 1 256
Thruster 2 256
Thruster 3 272
Thruster 4 272
Thruster Pairs
Thruster 1 & 2 512
Thruster 3 & 4 544
Eric Chubin
Mission Operations Engineer - OCO2, IBEX
Northrop Grumman Innovation Systems
OCO2 MOC#: (703) 429 - 7015
Mobile#: (240) 328 - 2098
Eric.Chubin@ngc.com