Guys,
The Perigee contacts on 16 Apr 19 were nominal for CMD and TLM. The inertial maneuver was nominal.
The following was accomplished::
Reset the Master Timer
Set_SC_Time.scr
Reset_FDC_Totals
@FMI_SetDownlink (320ksps)
@FTG_DumpBackorbit (from start,0,0,0,0)
Dumped SSR -> Dump New (VC2=31778/17)
CAR 1031 Orbit# 444 ATS upload
IBEX_2019_106_o0444a_v001.scr (13 - 105)
CAR 1032 Orbit# 444 HGC Cal Upload
IBEX_2019_106_o0444a_HGC_v001.scr (106 – 169)
CSS Angle TLM |
0.437455 |
|
CSS Sun-Pointing Angle |
0.87491 |
|
11 Apr 19 @ 14:00 |
||
CSS Angle TLM |
0.350545 |
|
CSS Sun-Pointing Angle |
0.70109 |
|
16 Apr 19 @ 09:00 |
||
Pre-Burn |
|
|
Thruster 1 |
9088 |
11 Apr 19 @ 14:00 |
Thruster 2 |
8864 |
|
Thruster 3 |
11184 |
|
Thruster 4 |
11408 |
|
Post-Burn |
|
|
Thruster 1 |
9360 |
16 Apr 19 @ 09:00 |
Thruster 2 |
9136 |
|
Thruster 3 |
11488 |
|
Thruster 4 |
11712 |
|
Number of Pulses |
|
|
Thruster 1 |
272 |
|
Thruster 2 |
272 |
|
Thruster 3 |
304 |
|
Thruster 4 |
304 |
|
Thruster Pairs |
||
Thruster 1 & 2 |
544 |
|
Thruster 3 & 4 |
608 |
Sheral R. Wesley
Principal Engr Satellite Systems
ICESat2, IBEX and OCO2 Mission OPS
CRS/CYGNUS Mission Planning
Northrop Grumman Innovation Systems
Bldg. 2 Room 1337
Cell (202) 236-0802