All,
Attached are the planning files for Orbit #430.
Please respond to this thread with comments and approvals.
Approvals are required by COB 28 Nov 18.
Note the Following:
1.
Battery Balancing
Please note that the battery balancing is normally performed around perigee. This time since we will be doing the star tracker image dump close to perigee. The battery balancing will be done between the first and
second perigee contacts.
# 2018-12-18T00:09:07.036Z,Perigee,orbit:430
@ECT_SetLongEclipseFlag TRUE $TIME=2018/12:17:20:00:00
@ECT_SetLongEclipseFlag FALSE $TIME=2018/12:17:21:30:00
2.
IBEX_2018_343_o0430a_v001_.ccvr
The 2 IBX-CLC-006 errors are because of the 2 perigee contacts that are close to each other. This is an acceptable error message.
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2018/12/18 04:28:00 UTC - 2018/12/18
06:02:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-006: Planned transmission at 2018/12/18 07:58:00 UTC - 2018/12/18
09:02:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 9480.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2018/12/09 10:50:45 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2018/12/13 16:40:31 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Timothy E. Perry
CRS, IBEX, OCO-2 & TESS
Mission Operations
Office (703) 406-5976
Cell (301) 606-1430
Corp Cell (571) 447-8977