I approve ATS for Orbit# 403
From: Wesley, Sheral
Sent: Tuesday, March 27, 2018 2:25 PM
To: Chubin, Eric <Eric.Chubin@OrbitalATK.com>; Colin Joyce <cjl46@wildcats.unh.edu>; David Heirtzler <dheirtzl@atlas.sr.unh.edu>; IBEX-FDG <IBEX.fdg@applieddefense.com>; IBEXOPS <IBEXOPS@gmail.com>; ISOC <isocops@lists.sr.unh.edu>; Ken Fairchild <kwfairchild@gmail.com>;
Ken Fairchild <fair-play@comcast.net>; Lockwood, Robert <Robert.Lockwood@OrbitalATK.com>; Nigel Angold <nigel.angold@nasa.gov>; Paul Janzen <paul.janzen@umontana.edu>; Perry, Timothy <Timothy.Perry@OrbitalATK.com>; Tyler, Ryan <Ryan.Tyler@OrbitalATK.com>;
Wesley, Sheral <Sheral.Wesley@OrbitalATK.com>
Subject: IBEX Orbit# 403 ATS Approval (7 Apr 18 - 16 Apr 18)
Guys,
Here are the planning files and ATS for Orbit# 403.
Please respond to this email thread with comments and approvals
Approvals are required before 29 Mar 18 @0900 UTC
Note the following:
1.
PERIGEE Battery Balancing
Orbit# 403 PERIGEE Battery Balancing
# 2018-04-16T15:34:57.572Z,Perigee,orbit:403
SetLongEclipseFlag TRUE $TIME=2018/04:16:15:00:00
SetLongEclipseFlag FALSE $TIME=2018/04:16:16:30:00
2.
Command Load Constraint Violation Report
IBEX_2018_097_o0403a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2018/04/16 21:28:00 UTC - 2018/04/16
23:02:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2018/04/08 01:56:07 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2018/04/11 18:34:44 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
Sr Systems Engineer
IBEX , OCO2 Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802