Guys,
Here are the planning files and ATS for Orbit# 396.
Please respond to this email with comments and approvals
Approvals are required before 24 Jan 18 @1800 UTC
Note the following:
1.
Battery Balancing at Perigee
Orbit# 396 Battery Balancing at Perigee
# 2018-02-13T00:05:58.104Z,Perigee,orbit:396
SetLongEclipseFlag TRUE $TIME=2018/02:13:01:00:00
SetLongEclipseFlag FALSE $TIME=2018/02:13:02:30:00
2.
Moon in Lo FOV
Orbit# 396 APOGEE: Moon in LO FOV Commands
# 2018-02-10T10:05:05.989Z,MoonInLoFovStart,orbit:396
# 2018-02-11T03:20:53.145Z,MoonInLoFovStop,orbit:396
3.
Command Load Constraint Violation Report
IBEX_2018_035_o0396a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2018/02/04 13:01:47 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2018/02/07 23:36:35 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
Sr Systems Engineer
IBEX , OCO2 Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802