Guys,
Here are the planning files and ATS for Orbit# 394
Please respond to this email thread with your comments and approvals
Approvals are required before 7 Jan 18 @1000 UTC
Note the following:
1.
Moderate Eclipse
# 2018-01-26T01:27:13.624Z,PenumbraEntry,orbit:394
# 2018-01-26T01:27:13.624Z,EclipseEntry,moderate:true,long:false,orbit:394
# 2018-01-26T02:29:52.913Z,PenumbraExit,orbit:394
# 2018-01-26T02:29:52.913Z,EclipseExit,moderate:true,long:false,orbit:394
SetLongEclipseFlag TRUE $TIME=2018/01:25:23:35:00
SetLongEclipseFlag FALSE $TIME=2018/01:26:02:35:00
2.
Moon in Lo FOV Commands
3.
Command Load Constraint Violation Report
IBEX_2018_017_o0394a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2018/01/17 13:24:48 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2018/01/21 14:38:04 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
Sr Systems Engineer
IBEX , OCO2 Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802