Guys,
Here are the planning files and ATS for Orbit# 386.
Please respond to this email thread with your comments and approvals
Approvals are required before 26 Oct @1800 UTC
Note the following:
1. The OEF is longer than usual because of the PERIGEE
sun maneuver in Orbit# 385.
2. The EPH v002 file was generated because of the
PERIGEE sun maneuver in Orbit# 385.
3. Moon in LO FOV commands
2017-11-10T15:47:35.221Z,MoonInLoFovStart,orbit:386
2017-11-11T21:25:20.759Z,MoonInLoFovStop,orbit:386
4. Battery Balancing Commands
# 2017-11-14T17:13:49.583Z,Perigee,orbit:386
SetLongEclipseFlag TRUE $TIME=2017/11:14:16:00:00
SetLongEclipseFlag FALSE $TIME=2017/11:14:17:30:00
5. Command Load Constraint Violation Report
IBEX_2017_309_o0386a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/11/05 20:37:11 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/11/09 17:24:58 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
Sr Systems Engineer
IBEX , OCO2 Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802
<image001.jpg>