[Isocops] IBEX Goat Herder for 6 May 2021

Perry, Timothy E [US] (SP) Timothy.Perry at ngc.com
Thu May 6 08:57:20 EDT 2021


All,

   The perigee pass had command issues for the first 10 minutes of the pass. The station USHI01 was unable to bring up their command carrier. SSC decided to switch us over to the USHI02 station. We were able to get a command uplink and send commands to the spacecraft. During the pass FDC totals were reset. A DR is pending and the new Razor #I100-687.



Tasks Accomplished:

Reset FDC totals



Results from the Inertial Maneuver:
Q1 -0.60373600
Q2 -0.05523310
Q3 -0.65632700
Q4 0.44909500

GPS sec 1304337678

UTC time 05/06/2021 12:01:04

MPS Cmd Vector X 0.738961000
MPS Cmd Vector Y 0.622087000
MPS Cmd Vector Z 0.258735000

MPS Diff 0.594 deg

CSS Angle TLM 0.660508
CSS Sun-Pointing Angle 1.321016
  01Apr 21 @ 00:00:00

CSS Angle TLM 0.874469
CSS Sun-Pointing Angle 1.748938
  06Apr 21 @ 12:00:00

Pre-Burn
Thruster 1 272 01Apr 21 @ 00:00:00
Thruster 2 272
Thruster 3 304
Thruster 4 304

Post-Burn
Thruster 1 544 06Apr 21 @ 12:00:00
Thruster 2 544
Thruster 3 608
Thruster 4 608

Number of Pulses
Thruster 1 272
Thruster 2 272
Thruster 3 304
Thruster 4 304


Timothy E.Perry
CRS IBEX OCO-2
Mission Operations
timothy.perry at ngc.com
Office (703) 406-5976
Cell (301) 606-1430

[cid:image001.png at 01D542D6.6047A400]


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20210506/eda5b62c/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 5047 bytes
Desc: image001.png
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20210506/eda5b62c/image001.png>


More information about the Isocops mailing list