[Isocops] IBEX Orbit #482 ATS Approval ( 27 Mar - 5 Apr 2020 )
Nigel Angold
angoldconsulting at earthlink.net
Tue Mar 17 16:47:03 EDT 2020
I approve IBEX_2020_087_o0482a_v001.scr
Nigel
> All,
> Attached are the planning files for Orbit #482
> Please respond to this thread with comments and approvals.
> Approvals are required by COB on 17 Mar 2020
>
> Please note the following:
> 1. Battery Balancing
> # Orbit 482 Battery Balancing
> # 2020-04-05T06:48:25.267Z,Perigee,orbit:482
> @ECT_SetLongEclipseFlag TRUE $TIME=2020/04:05:06:00:00
> @ECT_SetLongEclipseFlag FALSE $TIME=2020/04:05:07:30:00
>
> 2. Command Load Constraint Violation Report (CCVR)
> IBEX_2020_087_o0482a_v001_.ccvr
>
> ==========================
> HARD CONSTRAINT VIOLATIONS
> ==========================
> NO VIOLATIONS.
>
> ==========================
> SOFT CONSTRAINT VIOLATIONS
> ==========================
> These 2 IBX-CLC-006 soft violations are acceptable. The 2 contacts are as follows:
> IBEX,USAK01,ADD,03/27/20,087,13:00:00,03/27/20,087,14:00:00,,LAHO 160K IBEX-3 Orbit# 481 SSR_Dump/Tracking Contact 14re Asc
> IBEX,AUWA01,ADD,03/27/20,087,17:00:00,03/27/20,087,18:00:00,,LAHO 64K IBEX-3 Orbit# 482 HI BK Grnd Test 16re Asc End
> The is a 3 hour gap between the 2 contacts. This will give the transmitters plenty of time to cool down. Also, the transmitter temp is a point that we routinely monitor.
>
> IBX-CLC-006: Planned transmission at 2020/03/27 12:58:00 UTC - 2020/03/27
> 14:02:00 UTC is followed by one or more additional transmissions
> which, when combined, exceed the maximum transmission time of 5400
> seconds within a 18000-second window (total planned transmission
> time this window is 7680.000 seconds)
> IBX-CLC-006: Planned transmission at 2020/03/27 16:58:00 UTC - 2020/03/27
> 18:02:00 UTC is preceded by one or more additional transmissions
> which, when combined, exceed the maximum transmission time of 5400
> seconds within a 18000-second window (total planned transmission
> time this window is 7680.000 seconds)
> IBX-CLC-016: No command to enable spin pulse protection was found after
> transition to science mode at 2020/03/27 12:57:42 UTC
> IBX-CLC-016: No command to enable spin pulse protection was found after
> transition to science mode at 2020/03/31 09:40:22 UTC
>
> ==============
> OTHER MESSAGES
> ==============
> NO MESSAGES.
>
>
>
> Timothy E.Perry
> CRS IBEX OCO-2
> Mission Operations
> timothy.perry at ngc.com <mailto:timothy.perry at ngc.com>
> Office (703) 406-5976
> Cell (301) 606-1430
>
> <image001.png>
>
>
> <IBEX-Command-Approval-Checklist-Rev16_F_482_TEP.docx><IBEX_Orbit482_Contacts.txt><IBEX_2020_087_o0482a_v001.oef><IBEX_2020_087_o0482a_v001.txt><IBEX_2020_087_o0482a_v001_.ccvr>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20200317/1073db95/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev16e-o482-nga.ngpdf
Type: application/octet-stream
Size: 151016 bytes
Desc: not available
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20200317/1073db95/IBEX-Command-Approval-Checklist-Rev16e-o482-nga-0001.ngpdf>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20200317/1073db95/attachment-0003.html>
More information about the Isocops
mailing list