Note: Angle at orbit 461 arc B descending after the apogee sun precession maneuver: 4.135 deg

Note: Angle at orbit 462 apogee after the perigee sun precession maneuver: 4.526 deg


I have looked at the orbit 461 ATS,


IBEX_2019_260_o0461a_v002.scr,


and I approve.


The only constraint violations in


IBEX_2019_260_o0461a_v002.ccvr

 

are from the removal of the


ACT_SetSpinPulseProtectEnable Enable


commands (2) and the proximity of the perigee contacts; the violations are expected.


The PL commands in the v002 ATS match those in the v004 STF,


IBEX_2019_260_o0461a_v004.stf.


Ascending and descending command sequences are consistent with each other, 15 Re ascending, the apogee maneuver time and 15 Re descending as determined from the OEF,


IBEX_2019_260_o0461a_v002.oef,


and as verified with ibex_orbit.


There are no star tracker outages.


The ground station command sequences are correct and the timing and bit rates match those in the contacts file,


IBEX_Orbit461_Contacts_v2.txt,


for all contacts (4).


We are not doing battery cell balancing this orbit; we'll do it again in the next orbit.


The sun precession maneuver at perigee of orbit 460 left us pointing in safe directions for the orbit 461 arc A ascending and descending sequences:


ibex_rotate -o -r +173.921 -d +2.643 -w ibex-sun -t 2019/09:17:12:07:50

Quaternion +0.000000,+0.000000,+0.000000,+0.000000

points axis +1.000000,+0.000000,+0.000000

towards ECI -0.993319,+0.105787,+0.046113

which is R.A. +173.921 Decl. +2.643

missing R.A. +174.536 Decl. +2.341 (ibex-sun)

error is R.A. +0.615 Decl. +0.302

for a total 0.685 deg


ibex_rotate -o -r +173.921 -d +2.643 -w ibex-sun -t 2019/09:21:13:13:06

Quaternion +0.000000,+0.000000,+0.000000,+0.000000

points axis +1.000000,+0.000000,+0.000000

towards ECI -0.993319,+0.105787,+0.046113

which is R.A. +173.921 Decl. +2.643

missing R.A. +178.070 Decl. +0.842 (ibex-sun)

error is R.A. +4.149 Decl. +1.801

for a total 4.521 deg


The sun precession maneuver at apogee leaves us pointing in safe directions at the time of the maneuver and for arc B ascending and descending sequences:


ibex_rotate -o -r +178.138 -d +0.814 -w ibex-sun -t 2019/09:21:15:01:14

Quaternion +0.000000,+0.000000,+0.000000,+0.000000

points axis +1.000000,+0.000000,+0.000000

towards ECI -0.999371,+0.032489,+0.014207

which is R.A. +178.138 Decl. +0.814

missing R.A. +178.138 Decl. +0.814 (ibex-sun)

error is R.A. +0.000 Decl. +0.000

for a total 0.001 deg


ibex_rotate -o -r +178.138 -d +0.814 -w ibex-sun -t 2019/09:21:16:31:20

Quaternion +0.000000,+0.000000,+0.000000,+0.000000

points axis +1.000000,+0.000000,+0.000000

towards ECI -0.999371,+0.032489,+0.014207

which is R.A. +178.138 Decl. +0.814

missing R.A. +178.195 Decl. +0.790 (ibex-sun)

error is R.A. +0.057 Decl. +0.024

for a total 0.062 deg


ibex_rotate -o -r +178.138 -d +0.814 -w ibex-sun -t 2019/09:25:17:14:17

Quaternion +0.000000,+0.000000,+0.000000,+0.000000

points axis +1.000000,+0.000000,+0.000000

towards ECI -0.999371,+0.032489,+0.014207

which is R.A. +178.138 Decl. +0.814

missing R.A. +181.937 Decl. -0.819 (ibex-sun)

error is R.A. +3.799 Decl. +1.633

for a total 4.135 deg


The sun precession maneuver at perigee leaves us pointing in safe directions at the time of the maneuver and at orbit 462 apogee:


ibex_rotate -o -r +182.055 -d -0.875 -w ibex-sun -t 2019/09:25:20:20:06

Quaternion +0.000000,+0.000000,+0.000000,+0.000000

points axis +1.000000,+0.000000,+0.000000

towards ECI -0.999240,-0.035855,-0.015271

which is R.A. +182.055 Decl. -0.875

missing R.A. +182.055 Decl. -0.875 (ibex-sun)

error is R.A. +0.000 Decl. +0.000

for a total 0.000 deg


ibex_rotate -o -r +182.055 -d -0.875 -w ibex-sun -t 2019-09-30T14:19:18.321Z

Quaternion +0.000000,+0.000000,+0.000000,+0.000000

points axis +1.000000,+0.000000,+0.000000

towards ECI -0.999240,-0.035855,-0.015271

which is R.A. +182.055 Decl. -0.875

missing R.A. +186.209 Decl. -2.678 (ibex-sun)

error is R.A. +4.154 Decl. +1.803

for a total 4.526 deg


No Lo O-mode.


There is no overlap with orbit 460 commands by manual inspection or by checking at


http://ibex.unh.edu/cgi-bin/ats.cgi.


Command Approval Checklist is attached.


Ken



> On September 9, 2019 at 4:39 PM "Perry, Timothy" <Timothy.Perry at ngc.com> wrote:
> 
> 
>     All,
> 
>        Attached are the planning files for Orbit #461
> 
>     Please respond to this thread with comments and approvals.  
> 
>     Approvals are required by COB on 12 Sept 2019.  
> 
> 
>     Please note the following:
> 
>          1.       No Battery Balancing this orbit
> 
>      
> 
>          2.       We have 2 IBX-CLC-006 soft Constraint Error’s with this ATS. These errors are acceptable. On 09/16 we have 2 60 minute contacts planned that are separated by 2 hours.  The limit for MPS is 90 minutes for a 5 hour period. The 2 hour period between contacts will allow the transmitter to cool down.  
> 
>          IBEX,AUWA01,ADD,09/25/19,268,15:00:00,09/25/19,268,16:00:00,,LAHO 160K IBEX-2 Orbit# 461 Hi BG Test End
> 
>          IBEX,USHI01,ADD,09/25/19,268,18:00:00,09/25/19,268,19:00:00,,LAHO 160K IBEX-2 Orbit# 461 SSR_Dump/Tracking Contact
> 
>           
> 
>          3.       The time of the apogee maneuver time has changed from 2019-09-21 04:46:14 to  2019-09-21 14:46:14. So, the apogee contact had to be rescheduled from 09/21/19 09:00:00 to 09/22/19 03:00:00.
> 
>      
> 
>          4.       Command Load Constraint Violation Report (CCVR)
> 
>          # Filename:            IBEX_2019_260_o0461a_v002.ccvr
> 
>          # Input files:         1
> 
>          #   IBEX_2019_260_o0461a_v002.scr
> 
>           
> 
>          ==========================
> 
>          HARD CONSTRAINT VIOLATIONS
> 
>          ==========================
> 
>          NO VIOLATIONS.
> 
>           
> 
>          ==========================
> 
>          SOFT CONSTRAINT VIOLATIONS
> 
>          ==========================
> 
>          IBX-CLC-006: Planned transmission at 2019/09/25 14:58:00 UTC - 2019/09/25
> 
>                       16:02:00 UTC is followed by one or more additional transmissions
> 
>                       which, when combined, exceed the maximum transmission time of 5400
> 
>                       seconds within a 18000-second window (total planned transmission
> 
>                       time this window is 7680.000 seconds)
> 
>          IBX-CLC-006: Planned transmission at 2019/09/25 17:58:00 UTC - 2019/09/25
> 
>                       19:02:00 UTC is preceded by one or more additional transmissions
> 
>                       which, when combined, exceed the maximum transmission time of 5400
> 
>                       seconds within a 18000-second window (total planned transmission
> 
>                       time this window is 7680.000 seconds)
> 
>          IBX-CLC-016: No command to enable spin pulse protection was found after
> 
>                       transition to science mode at 2019/09/17 09:46:50 UTC
> 
>          IBX-CLC-016: No command to enable spin pulse protection was found after
> 
>                       transition to science mode at 2019/09/21 16:01:20 UTC
> 
>           
> 
>          ==============
> 
>          OTHER MESSAGES
> 
>          ==============
> 
>          NO MESSAGES.
> 
>      
> 
>      
> 
>     Timothy E.Perry
> 
>     CRS IBEX OCO-2
> 
>     Mission Operations
> 
>     tim.perry at ngc.com
> 
>     Office (703) 406-5976
> 
>     Cell (301) 606-1430
> 
>      
> 
>     [cid:image001.png at 01D542D6.6047A400]
> 
>      
> 
>      
> 
> 
> 
>     ---------------------------------------------
>     Notice: This e-mail is intended solely for use of the individual or entity to which it is addressed and may contain information that is proprietary, privileged and/or exempt from disclosure under applicable law. If the reader is not the intended recipient or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. This communication may also contain data subject to U.S. export laws. If so, data subject to the International Traffic in Arms Regulation cannot be disseminated, distributed, transferred, or copied, whether incorporated or in its original form, to foreign nationals residing in the U.S. or abroad, absent the express prior approval of the U.S. Department of State. Data subject to the Export Administration Act may not be disseminated, distributed, transferred or copied contrary to U. S. Department of Commerce regulations. If you have received this communication in error, please notify the sender by reply e-mail and destroy the e-mail message and any physical copies made of the communication.
>      Thank you. 
>     *********************
> 


 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20190913/514212cd/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev16e-o0461-v002_KWF.doc
Type: application/msword
Size: 119296 bytes
Desc: not available
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20190913/514212cd/IBEX-Command-Approval-Checklist-Rev16e-o0461-v002_KWF-0001.doc>


More information about the Isocops mailing list