[Isocops] IBEX Orbit #429 ATS Approval ( 30 Nov - 09 Dec )

Angold, Nigel G. (GSFC-444.0)[Johns Hopkins University Applied Physics Lab] nigel.angold at nasa.gov
Mon Nov 26 11:43:01 EST 2018


I approve IBEX_2018_334_o0429a_v001.scr

Nigel

All,
   Attached are the planning files for Orbit #429.
Please respond to this thread with comments and approvals.
Approvals are required by COB 26 Dec 18.

Note the Following:
1.    Uplink Opportunities:
Since the ATS IBEX_2018_325_o0428a_LGC_v001.scr will be uplinked during the perigee contacts for Orbit #427. The following contacts will be used for the Orbit# 429 ATS uplink.
IBEX,USHI01,ADD,11/27/18,331,23:30:00,11/28/18,332,00:05:00,,LAHO 2K IBEX-3 Orbit# 428 Tracking Contact
IBEX,AUWA01,ADD,11/29/18,333,19:30:00,11/29/18,333,20:30:00,,LAHO 160K Orbit # 428 SSR_Dump/Tracking Contact
2.    Battery Balancing
#  Orbit# 429 PERIGEE Battery Balancing
#  2018-12-09T00:43:36.668Z,Perigee,orbit:429
  @ECT_SetLongEclipseFlag TRUE $TIME=2018/12:09:00:30:00
  @ECT_SetLongEclipseFlag FALSE $TIME=2018/12:09:02:00:00

3.    IBEX_2018_334_o0429a_v001_.ccvr
The following “IBX-CLC-006” errors are acceptable. The maximum transmission time of 90 minutes was exceeded for the 5 hour period. This is acceptable since we have 2 60 minute contacts with a 4 hour 30 minute gap between the 2 contacts for transmitter cool down time.
IBEX,AUWA01,ADD,12/08/18,342,11:00:00,12/08/18,342,12:00:00,,LAHO 64K IBEX-3  Orbit # 430 Lo Sweep Hi BG test Start
IBEX,AUWA01,ADD,12/08/18,342,16:30:00,12/08/18,342,17:30:00,,LAHO 160K IBEX-3 Orbit # 429 SSR_Dump/Tracking Contact

==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.

==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2018/12/08 10:58:00 UTC - 2018/12/08
             12:02:00 UTC is followed by one or more additional transmissions
             which, when combined, exceed the maximum transmission time of 5400
             seconds within a 18000-second window (total planned transmission
             time this window is 5880.000 seconds)
IBX-CLC-006: Planned transmission at 2018/12/08 16:28:00 UTC - 2018/12/08
             17:32:00 UTC is preceded by one or more additional transmissions
             which, when combined, exceed the maximum transmission time of 5400
             seconds within a 18000-second window (total planned transmission
             time this window is 5880.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2018/11/30 13:53:40 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2018/12/04 05:51:59 UTC

==============
OTHER MESSAGES
==============
NO MESSAGES.







Timothy E. Perry
Mission Operations
CRS, IBEX, OCO-2 & TESS
RAPTOR Test Team
timothy.perry at ngc.com<mailto:timothy.perry at ngc.com>
Office (703) 406-5976
Cell (301) 606-1430

<image002.png>


________________________________
Notice: This e-mail is intended solely for use of the individual or entity to which it is addressed and may contain information that is proprietary, privileged and/or exempt from disclosure under applicable law. If the reader is not the intended recipient or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. This communication may also contain data subject to U.S. export laws. If so, data subject to the International Traffic in Arms Regulation cannot be disseminated, distributed, transferred, or copied, whether incorporated or in its original form, to foreign nationals residing in the U.S. or abroad, absent the express prior approval of the U.S. Department of State. Data subject to the Export Administration Act may not be disseminated, distributed, transferred or copied contrary to U. S. Department of Commerce regulations. If you have received this communication in error, please notify the sender by reply e-mail and destroy the e-mail message and any physical copies made of the communication.
 Thank you.
*********************
<IBEX_2018_334_o0429a_v001_.ccvr><IBEX_Orbit429_Contacts.txt><IBEX_2018_334_o0429a_v001.oef><IBEX_2018_334_o0429a_v001.txt><IBEX-Command-Approval-Checklist-Rev16_E_429_TEP.docx>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20181126/6da15a29/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev16e-o429-nga.pdf
Type: application/pdf
Size: 151579 bytes
Desc: IBEX-Command-Approval-Checklist-Rev16e-o429-nga.pdf
URL: <https://lists.sr.unh.edu/pipermail/isocops/attachments/20181126/6da15a29/IBEX-Command-Approval-Checklist-Rev16e-o429-nga-0001.pdf>


More information about the Isocops mailing list