[Isocops] IBEX ORbit# 363 ATS (10 Apr 17 - 19 Apr 17)

Reno, Michelle mreno at swri.edu
Wed Mar 29 20:15:02 EDT 2017


I approve IBEX_2017_100_o0363a_v001.scr, pending ISOC confirmation that the sun-angle at DESCENDING is within limits.

--
Chelle Reno
IBEX Mission Operations Manager
Juno/JADE Deputy Project Manager
Austin Mission Consulting
(210) 478-7337
________________________________
From: Wesley, Sheral [Sheral.Wesley at OrbitalATK.com]
Sent: Tuesday, March 28, 2017 1:52 PM
To: Wesley, Sheral; David Heirtzler; IBEX-FDG; IBEXOPS; ISOC; Ken Fairchild; Ken Fairchild; Lockwood, Robert; Reno, Michelle; Nigel Angold; Paul Janzen; Perry, Timothy; Tyler, Ryan
Subject: IBEX ORbit# 363 ATS (10 Apr 17 - 19 Apr 17)

Guys,
Here are the planning files and ATS for Orbit# 363.
Please respond to this email thread with your comments and approvals
Approvals are required before 31 Mar @1200 UTC

Note the following:

1.       APL-18 SSR_Dump Contact for Orbit# 362
SetRelay stx,on $TIME=2017/04:11:00:58:00
SetDownlink2K $TIME=2017/04:11:00:58:02
SetBilevelOutputControlReg STXMODE_Strobe,ON $TIME=2017/04:11:00:58:04
SetBilevelOutputControlReg COHERENT,ON $TIME=2017/04:11:00:58:06
SetDownlink320K $TIME=2017/04:11:01:05:00
SSR_DUMP_NEW $TIME=2017/04:11:01:10:00
SetRelay stx,off $TIME=2017/04:11:02:02:00


2.       Apogee Sun Maneuver
2017-04-14T23:36:55.000Z,SunMvrBegin,orbit:363
2017-04-14T23:37:27.783Z,Apogee,orbit:363
2017-04-14T23:51:55.000Z,SunMvrEnd,orbit:363


3.       Command Load Constraint Violation Report
IBEX_2017_100_o0363a_v001.scr

==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.

==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2017/04/19 07:58:00 UTC - 2017/04/19
             09:02:00 UTC is followed by one or more additional transmissions
             which, when combined, exceed the maximum transmission time of 5400
             seconds within a 18000-second window (total planned transmission
             time this window is 7680.000 seconds)
IBX-CLC-006: Planned transmission at 2017/04/19 12:58:00 UTC - 2017/04/19
             14:02:00 UTC is preceded by one or more additional transmissions
             which, when combined, exceed the maximum transmission time of 5400
             seconds within a 18000-second window (total planned transmission
             time this window is 7680.000 seconds)
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2017/04/10 23:00:01 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
             transition to science mode at 2017/04/15 00:52:01 UTC

==============
OTHER MESSAGES
==============
NO MESSAGES.


Sheral  R. Wesley
Sr Systems Engineer
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2   Room 1337
Office (703) 406-5641
Cell (202) 236-0802
[cid:image001.jpg at 01D04F6C.5A1C97F0]


________________________________
Notice: This e-mail is intended solely for use of the individual or entity to which it is addressed and may contain information that is proprietary, privileged and/or exempt from disclosure under applicable law. If the reader is not the intended recipient or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. This communication may also contain data subject to U.S. export laws. If so, data subject to the International Traffic in Arms Regulation cannot be disseminated, distributed, transferred, or copied, whether incorporated or in its original form, to foreign nationals residing in the U.S. or abroad, absent the express prior approval of the U.S. Department of State. Data subject to the Export Administration Act may not be disseminated, distributed, transferred or copied contrary to U. S. Department of Commerce regulations. If you have received this communication in error, please notify the sender by reply e-mail and destroy the e-mail message and any physical copies made of the communication.
 Thank you.
*********************
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.sr.unh.edu/pipermail/isocops/attachments/20170330/54b50245/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 2392 bytes
Desc: image001.jpg
URL: <http://lists.sr.unh.edu/pipermail/isocops/attachments/20170330/54b50245/image001-0001.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev16b-o0363-cr.pdf
Type: application/pdf
Size: 152167 bytes
Desc: IBEX-Command-Approval-Checklist-Rev16b-o0363-cr.pdf
URL: <http://lists.sr.unh.edu/pipermail/isocops/attachments/20170330/54b50245/IBEX-Command-Approval-Checklist-Rev16b-o0363-cr-0001.pdf>


More information about the Isocops mailing list