[Isocops] IBEX Orbit# 278 ATS v003 Approval (27 Feb 15 - 8 Mar 15)
Reno, Michelle
mreno at swri.edu
Mon Feb 16 12:41:39 EST 2015
Checklist attached.
________________________________
From: Reno, Michelle
Sent: Monday, February 16, 2015 11:27 AM
To: Ibex Mission Operations; Harold Kucharek; IBEX FDG; ISOC at New Hampshire; Ken Fairchild; Marty Quinn; Nigel Angold; Paul Janzen; robert.lockwood at orbitalatk.com; ryan.tyler at orbitalatk.com; tim.perry at orbitalatk.com; sheral.wesley at orbitalatk.com
Subject: RE: IBEX Orbit# 278 ATS v003 Approval (27 Feb 15 - 8 Mar 15)
I approve IBEX_2015_058_o0278a_v003.scr
--
Chelle Reno
IBEX Mission Operations Manager
Juno/JADE Deputy Project Manager
Austin Mission Consulting
(210) 478-7337
________________________________
From: Ibex Mission Operations [ibexops at gmail.com]
Sent: Friday, February 13, 2015 11:51 PM
To: Harold Kucharek; IBEX FDG; ISOC at New Hampshire; Ken Fairchild; Marty Quinn; Reno, Michelle; Nigel Angold; Paul Janzen; robert.lockwood at orbitalatk.com; ryan.tyler at orbitalatk.com; tim.perry at orbitalatk.com; sheral.wesley at orbitalatk.com
Subject: IBEX Orbit# 278 ATS v003 Approval (27 Feb 15 - 8 Mar 15)
Guys,
Here are the planning files and ATS for Orbit# 278. Please respond to this email thread with your comments and approvals. Approvals are required before 17 Feb 15 @ 1400 UTC
Please note the following:
1. Moderate Eclipse at PERIGEE
Orbit# 278 PERIGEE: Moderate Eclipse Commands
# 2015-03-08T18:30:10.907Z,PenumbraEntry,orbit:278
# 2015-03-08T18:30:10.907Z,EclipseEntry,moderate:true,long:false,orbit:278
ECT_SetLongEclipseFlag TRUE $TIME=2015/03:08:16:35:00
ECT_SetLongEclipseFlag FALSE $TIME=2015/03:08:19:30:00
# cells should be ~3.9V at end of eclipse
# 2015-03-08T19:30:18.057Z,PenumbraExit,orbit:278
# 2015-03-08T19:30:18.057Z,EclipseExit,moderate:true,long:false,orbit:278
2. APOGEE Sun Maneuver
3. Command Load Constraint Violation Report
IBEX_2015_058_o0278a_v003.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-015: Battery charge falls below minimum from 2015/03/08 19:24:10 UTC -
2015/03/08 19:42:18 UTC. Lowest charge level is 7737.193583
watt-minutes during this interval.
# –Set to TRUE at 16:35:00 (2 hours prior to start of eclipse)
# –Set to FALSE at 19:30:00 (cells should be ~3.9V at end of eclipse)
==============
OTHER MESSAGES
==============
NO MESSAGES.
--
Sheral R. Wesley
SPVR., Satellite Operations
IBEX Mission OPS
CYGNUS Mission Planning
(304) 279-6678
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20150216/2166f4d4/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev14-o0278-cr.pdf
Type: application/pdf
Size: 106957 bytes
Desc: IBEX-Command-Approval-Checklist-Rev14-o0278-cr.pdf
Url : http://lists.sr.unh.edu/mailman/private/isocops/attachments/20150216/2166f4d4/IBEX-Command-Approval-Checklist-Rev14-o0278-cr-0001.pdf
More information about the Isocops
mailing list