[Isocops] IBEX Orbit# 298 ATS Approval (28 Aug 15 - 5 Sept 15)

Angold, Nigel G. (GSFC-4440)[SOUTHWEST RESEARCH INST] nigel.angold at nasa.gov
Fri Aug 14 10:56:47 EDT 2015


I’ll be approving this one. The set eclipse flag times don’t look right in the previous email.

Nigel

> Guys,
>    Here are the planning files and ATS for Orbit# 298. Please respong to this email thread with your comments and approvals.
> Approvals are required before 16 Aug 16 @1700 UTC
>  
> Note the following:
> 1. Battery Balancing at PERIGEE
> Orbit# 298 PERIGEE: Battery Balancing Commands
> # 2015-09-05T13:11:11.811Z,Perigee,orbit:298
>  SetLongEclipseFlag TRUE $TIME=2015/09:05:13:00:00
>  SetLongEclipseFlag FALSE $TIME=2015/09:05:12:30:00
>  
> 2. Moon in Lo FOV Commands
> 2015-08-31T22:03:54.510Z,MoonInLoFovStart,orbit:298
> 2015-09-02T06:06:19.872Z,MoonInLoFovStop,orbit:298
>  
> 
>  
> 
> -- 
> Sheral R. Wesley
> SPVR., Satellite Operations
> IBEX Mission OPS
> CYGNUS Mission Planning
> (304) 279-6678
>  
> <IBEX_2015_239_o0298a_v001.txt><IBEX_2015_239_o0298a_v001.ccvr><IBEX_2015_239_o0298a_v001.oef><IBEX_Orbit298Contacts.txt>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20150814/e45676fd/attachment.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: smime.p7s
Type: application/pkcs7-signature
Size: 8621 bytes
Desc: not available
Url : http://lists.sr.unh.edu/mailman/private/isocops/attachments/20150814/e45676fd/smime.p7s 


More information about the Isocops mailing list