[Isocops] IBEX Orbit# 248 Hi Gain Test ATS (5 Jun 14) - v001 approval
Ken Fairchild
fair-play at comcast.net
Mon May 19 02:23:43 EDT 2014
All,
I have looked at the orbit 248 Hi gain test ATS,
IBEX_2014_149_o0248a_hgc_v001.scr,
and I approve.
There are no constraint violations in
IBEX_2014_149_o0248a_hgc_v001.ccvr.
The commands in the v001 ATS match those in the v001 STF,
IBEX_2014_149_o0248a_v001_hgc.stf.
The timing is such that, as planned, the gain test starts in the last segment of arc B when the CEM voltages are at their nominal levels and completes before the next Hi ABAB operations voltage change. The beginning of the test occurs during the monitoring contact.
Ken
----- Original Message -----
From: "Ibex Mission Operations" <ibexops at gmail.com>
To: "Harold Kucharek" <Harald.Kucharek at unh.edu>, "IBEX FDG" <ibex at applieddefense.com>, "ISOC at New Hampshire" <isocops at lists.sr.unh.edu>, "Ken Fairchild" <fair-play at comcast.net>, "Michelle Reno" <mreno at swri.edu>, "Nigel Angold" <ngangold at earthlink.net>, "Paul Janzen" <paul.janzen at umontana.edu>, "Robert Lockwood" <Lockwood.Robert at Orbital.com>, "Ryan Tyler" <tyler.ryan at orbital.com>, "Sheral Wesley" <wesley.sheral at orbital.com>, "Tim Perry" <perry.tim at orbital.com>
Sent: Sunday, May 18, 2014 3:40:24 AM
Subject: IBEX Orbit# 248 Hi Gain Test ATS (5 Jun 14)
Here is the Orbit# 248 IBEX_Hi Gain Test ATS
Approvals are required before 3 Jun 14 @1800 UTC
--
Sheral R. Wesley
SPVR., Satellite Operations
IBEX Mission OPS
CYGNUS Mission Planning
(304) 279-6678
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20140519/a85780db/attachment.html
More information about the Isocops
mailing list