All, 


I have looked at the orbit 240 Hi gain test ATS, 


IBEX_2014_076_o0240a_hgc_v001.scr, 


and I approve. 


There are no constraint violations in 


IBEX_2014_076_o0240a_hgc_v001.ccvr. 


The commands in the v001 ATS match those in the v001 STF, 


IBEX_2014_076_o0240a_v001_hgc.stf. 


The timing of the commands is such that, as planned, the gain test occurs when the CEM voltages are at their nominal levels and completes before the next Hi ABAB operations voltage change. 


Ken 
----- Original Message -----
From: "Ibex Mission Operations" <ibexops at gmail.com> 
To: "IBEX-FDG" <IBEX.fdg at applieddefense.com>, "IBEXOPS/ORB" <IBEXops at orbital.com>, "ISOC at New Hampshire" <isocops at lists.sr.unh.edu>, "John Cavallo" <cavallo.john at orbital.com>, "Ken Fairchild" <fair-play at comcast.net>, "Nigel Angold" <ngangold at earthlink.net>, "Robert Lockwood" <Lockwood.Robert at Orbital.com>, "Ryan Tyler" <tyler.ryan at orbital.com>, "Sheral Wesley" <wesley.sheral at orbital.com>, "Thomas Regiec" <regiec.thomas at orbital.com>, "Tim Perry" <perry.tim at orbital.com>, "Paul Janzen" <Paul.Janzen at mso.umt.edu> 
Sent: Friday, March 7, 2014 11:43:50 AM 
Subject: IBEX Orbit# 240 IBEX_Hi Gain Test ATS 


Guys, 
Here is the ATS for the IBEX_Hi Gain Test in Orbit# 240. 
Approvals are required as soon as possible 

-- 

Sheral R. Wesley 
SPVR., Satellite Operations 
IBEX Mission OPS 
CYGNUS Mission Planning 
(304) 279-6678 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20140307/b093b5b3/attachment.html 


More information about the Isocops mailing list