[Isocops] IBEX Orbit# 240 ATS (17 Mar 14 - 26 Mar 14)

Tim Perry Perry.Tim at orbital.com
Fri Mar 7 08:36:57 EST 2014


All,
   I approve ATS: IBEX_2014_076_o0240a_v001.
     Tim

(See attached file: IBEX-Command-Approval-Checklist-Rev13b_240_TEP.doc)


Timothy E. Perry
CYGNUS Mission Planning
IBEX Mission Ops Lead
perry.tim at orbital.com
Office: (703) 406-5976
Cell:(301) 606-1430





From:	Ibex Mission Operations <ibexops at gmail.com>
To:	joe at boulder.swri.edu, IBEX-FDG <IBEX.fdg at applieddefense.com>,
            "IBEXOPS/ORB" <IBEXops at orbital.com>, ISOC at New Hampshire
            <isocops at lists.sr.unh.edu>, John Cavallo
            <cavallo.john at orbital.com>, Ken Fairchild
            <fair-play at comcast.net>, Mark Tapley <mtapley at swri.edu>, Nigel
            Angold <ngangold at earthlink.net>, Robert Lockwood
            <Lockwood.Robert at Orbital.com>, Roland Vanderspek
            <roland at space.mit.edu>, Ryan Tyler <tyler.ryan at orbital.com>,
            Sheral Wesley <wesley.sheral at orbital.com>, Thomas Regiec
            <regiec.thomas at orbital.com>, Tim Perry <perry.tim at orbital.com>
Date:	03/04/2014 02:51 PM
Subject:	IBEX Orbit# 240 ATS (17 Mar 14 - 26 Mar 14)



Guys,
   Here are the planning files for Orbit# 240.
Please respond to this email thread with any questions and approvals.
All approvals are required before 7 Mar 14 @2200 UTC

Please note the following

1. OEF Generation
The OEF was generated using o0238a OEF because Orbit# 239 has a Sun
Maneuver at Perigee

2. Small Eclipse at Perigee that requires no action
#  Orbit# 240 PERIGEE: Small Eclipse, No Action Required
# 2014-03-26T10:26:50.562Z,EclipseEntry,moderate:false,long:false,orbit:240
# 2014-03-26T10:42:37.825Z,EclipseExit,moderate:false,long:false,orbit:240

3. No Battery Balancing Commands

4. Moon in Lo FOV Commands
#  Orbit# 240  APOGEE: Moon in Lo FOV Commands
# 2014-03-25T00:30:09.041Z,MoonInLoFovStart,orbit:240
# 2014-03-25T12:51:01.535Z,MoonInLoFovStop,orbit:240

5. IBEX_Hi Gain Test commands occur around Apogee commands
#  Orbit# 240 IBEX_Hi Gain Test
# Start: $TIME=2014/03:19:16:00:00
# End:  $TIME=2014/03:19:20:13:45

6. Special Ops/Post-LUT Changes
 Hi negative collimator voltage set to 1400
 Hi ABAB (CEM comparison)


--
Sheral R. Wesley
SPVR., Satellite Operations
IBEX Mission OPS
CYGNUS Mission Planning
(304) 279-6678[attachment "IBEX_2014_076_o0240a_v001.txt" deleted by Tim
Perry/Dulles/Orbital] [attachment "IBEX_2014_076_o0240a_v001.ccvr" deleted
by Tim Perry/Dulles/Orbital] [attachment "IBEX_2014_076_o0240a_v001.oef"
deleted by Tim Perry/Dulles/Orbital] [attachment
"IBEX_Orbit240Contacts.txt" deleted by Tim Perry/Dulles/Orbital]

Notice: This e-mail is intended solely for use of the individual or entity to which it is addressed and may contain information that is proprietary, privileged and exempt from disclosure under applicable law. If the reader is not the intended recipient or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. This communication may also contain data subject to U.S. export laws. If so, that data subject to the International Traffic in Arms Regulation cannot be disseminated, distributed or copied to foreign nationals, residing in the U.S. or abroad, absent the express prior approval of the U.S. Department of State. If you have received this communication in error, please notify the sender by reply e-mail and destroy the e-mail message and any physical copies made of the communication. Thank you. 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev13b_240_TEP.doc
Type: application/msword
Size: 144384 bytes
Desc: not available
Url : http://lists.sr.unh.edu/mailman/private/isocops/attachments/20140307/1526cf4d/IBEX-Command-Approval-Checklist-Rev13b_240_TEP-0001.doc 


More information about the Isocops mailing list