[Isocops] IBEX Orbit# 244 IBEX_Hi Gain Test ATS (29 Apr 14) - v001 approval

Ken Fairchild fair-play at comcast.net
Fri Apr 11 09:14:46 EDT 2014


All, 


I have looked at the orbit 244 Hi gain test ATS, 




IBEX_2014_112_o0244a_hgc_v001.scr, 




and I approve. 




There are no constraint violations in 






IBEX_2014_112_o0244a_hgc_v001.ccvr. 




The commands in the v001 ATS match those in the v001 STF, 






IBEX_2014_112_o0244a_v001_hgc.stf. 




The timing of the commands is such that, as planned, the gain test starts in the last segment of arc B when the CEM voltages are at their nominal levels and completes before the next Hi ABAB operations voltage change. 




Ken 



----- Original Message -----
From: "Ibex Mission Operations" <ibexops at gmail.com> 
To: "Harold Kucharek" <Harald.Kucharek at unh.edu>, "IBEX FDG" <ibex at applieddefense.com>, "ISOC at New Hampshire" <isocops at lists.sr.unh.edu>, "Ken Fairchild" <fair-play at comcast.net>, "Michelle Reno" <mreno at swri.edu>, "Nigel Angold" <ngangold at earthlink.net>, "Paul Janzen" <paul.janzen at umontana.edu>, "Robert Lockwood" <Lockwood.Robert at Orbital.com>, "Ryan Tyler" <tyler.ryan at orbital.com>, "Sheral Wesley" <wesley.sheral at orbital.com>, "Tim Perry" <perry.tim at orbital.com> 
Sent: Wednesday, April 9, 2014 1:55:54 PM 
Subject: IBEX Orbit# 244 IBEX_Hi Gain Test ATS (29 Apr 14) 


Guys, 
Here are the planning files for the IBEX_Hi Gain Test. 
Please respond to this email thread with your comments and approvals 
All comments and approvals are required before 18 Apr 14 @ 1400 UTC 

1. The Hi Gain Test will occur between cycles of the IBEX_Hi ABAB (CEM comparison) Commands 
2. Command Load Constraint Violation Report (CCVR) 
# IBEX_2014_112_o0244a_hgc_v001.scr 
========================== 
HARD CONSTRAINT VIOLATIONS 
========================== 
NO VIOLATIONS. 
========================== 
SOFT CONSTRAINT VIOLATIONS 
========================== 
NO VIOLATIONS. 
============== 
OTHER MESSAGES 
============== 
NO MESSAGES. 

-- 

Sheral R. Wesley 
SPVR., Satellite Operations 
IBEX Mission OPS 
CYGNUS Mission Planning 
(304) 279-6678 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20140411/5b56da14/attachment.html 


More information about the Isocops mailing list