[Isocops] IBEX Goat Herder 19 Mar 13

Ibex Mission Operations ibexops at gmail.com
Tue Mar 19 11:24:05 EDT 2013


The Perigee tracking contact for Orbit# 199 was nominal for
command/telemetry and the inertial maneuver was successful.

The Tracking contact was started 10 minutes early (Blind_acq.scr (160ksps)
to ensure all objectives were completed.

The SSR_Dump contact with APL18 failed when the wrong spice files were
loaded at the ground station and they were unable to maintain lock on the
spacecraft during the contact. The SSR Data was downloaded successfully on
the Perigee tracking contact.

*RAZOR# 538 APL18 Failed SSR_Dump Contact 18 Mar 13 @1900 UTC*


-- 
Sheral R. Wesley
SPVR., Satellite Operations
IBEX Mission OPS
(304) 279-6678
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20130319/1e78c0e7/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX Goat Herder 19 Mar 13.doc
Type: application/msword
Size: 46592 bytes
Desc: not available
Url : http://lists.sr.unh.edu/mailman/private/isocops/attachments/20130319/1e78c0e7/IBEXGoatHerder19Mar13-0001.doc 


More information about the Isocops mailing list