[Isocops] IBEX Orbit# 133 ATS (18 July 11 - 27 July 11)

Reno, Michelle mreno at swri.edu
Thu Jul 7 11:10:38 EDT 2011


o133 ATS: 

I approve IBEX_2011_099_o0133a_v002

 

o132 Battery Cell Balancing:

1.     Verify charging cycle (Long eclipse flag=TRUE)  is 90 minutes
long  C. Reno

2.     Verify the first command sets the long eclipse flag to TRUE, the
second command sets the flag to FALSE.    C. Reno

3.     Verify P/L is in HVSTANDBY or HVENG   C. Reno

4.     Verify no charging cycle within 2 hours of ASCENDING or DECENDING
macro execution

Cycle 7 ends 1h29m before ASCENDING. Cycle should be shortened so FALSE
$TIME=2011/07:18:18:59:00 or removed.

     LE Flag FALSE  $TIME=2011/07:18:19:30:00

     ASCENDING_PL1 $TIME=2011/07:18:20:59:17

5.     Verify no charging cycle within 1 hour of maneuver 

We can leave Cycle 3. The thruster Enable command is 1h5m after the end
of the charging cycle

     LE Flag FALSE  $TIME=2011/07:18:07:30:00

      Thrust ENABLE $TIME=2011/07:18:08:35:40

      Thrust DISABLE $TIME=2011/07:18:08:50:40

6.     Verify no charging cycle during an eclipse

No eclipse

 

 

From: isocops-bounces at lists.sr.unh.edu
[mailto:isocops-bounces at lists.sr.unh.edu] On Behalf Of Ibex Mission
Operations
Sent: Wednesday, July 06, 2011 9:23 AM
To: Bret Hautamaki; IBEX-FDG; IBEXOPS/ORB; ISOC at New Hampshire; John
Cavallo; Mark Tapley; Robert Lockwood; Roland Vanderspek; Ryan Tyler;
Sheral Wesley; Thomas Regiec; Tim Perry; Walker Cross
Subject: Re: [Isocops] IBEX Orbit# 133 ATS (18 July 11 - 27 July 11)

 

Guys,

    I forgot to comment out another MPS Generated command.

 DELETED: @ACT_SetSpinPulseProtectEnable Disable
$TIME=2011/07:18:15:19:41

 

  Here is V002 of the Orbit# 133 ATS

On Wed, Jul 6, 2011 at 12:14 AM, Ibex Mission Operations <
ibexops at gmail.com> wrote:

Guys,

     Here are the planning files for Orbit# 133.

Approvals/comments are needed by COB Friday 8 July 11.

I have also included the Battery Balanng ATS that will be uploaded 13
July 11

 

Gain Test Commands loads for IBEX Hi and Lo will be generated and sent
out once the final STF's have been approved.

-- 
Sheral R. Wesley
SPVR., Satellite Operations
IBEX Mission OPS
(304) 279-6678 <tel:%28304%29%20279-6678> 




-- 
Sheral R. Wesley
SPVR., Satellite Operations
IBEX Mission OPS
(304) 279-6678 <tel:%28304%29%20279-6678> 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/mailman/private/isocops/attachments/20110707/751566f8/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX-Command-Approval-Checklist-Rev6-o0133-cr.doc
Type: application/msword
Size: 91648 bytes
Desc: IBEX-Command-Approval-Checklist-Rev6-o0133-cr.doc
Url : http://lists.sr.unh.edu/mailman/private/isocops/attachments/20110707/751566f8/IBEX-Command-Approval-Checklist-Rev6-o0133-cr-0001.doc 


More information about the Isocops mailing list