[Ibex-maneuver-engineering] Updated Timeline v8a

Reno, Michelle mreno at swri.edu
Wed Jun 8 14:07:11 EDT 2011


The spacecraft is in Housekeeping State, the heater setpoints have changed to 12/14 per the ADV1 ATS, and we are on track for our 2:45 EDT Pre-pass briefing and our 3:45 EDT maneuver pass.
 
Updated timeline attached.
 
 
~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Chelle Reno
Austin Mission Consulting
(210) 478-7337 (c)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~

________________________________

From: ibex-maneuver-engineering-bounces at lists.sr.unh.edu on behalf of Reno, Michelle
Sent: Tue 6/7/2011 1:42 PM
To: IBEX Maneuver Engineering
Subject: [Ibex-maneuver-engineering] You are on call : 6/8 1530 UTC SOH Pass


Hi team,
 
Please be advised you are on-call from 1530 UTC tomorrow & be ready to implement the following contingency schedule if needed. You do not need to show up at the MOC early unless called.
 
There may be a high radiation background due to solar activity starting tomorrow. Tim will take a pass at 1530 tomorrow to verify we have not entered Contingency due to radiation. The pass is scheduled with enough time to detect, diagnose & recover in time to execute the burn as planned.
 
Nominal Schedule :
1530-1545 SOH pass
   1700 Heater Setpoint change
1745-1815 Verify Heater Setpoints
   1850 22N Cat Bed Heaters On
1945-2100 ADV1 Pass
 
Schedule if in Contingency State on 1530 pass :
1530-1545 In Contingency State, snap pages, gather info
   1630 FRB, confirm due to radiation
1700-1800 Blind Acq, Contingency Recovery Proc, Upload Burn ATS, Manually change heater setpoints
   1850 22N Cat Bed Heaters On
1945-2100 ADV1 Pass 
 
Please be ready if response is needed.
 
Thanks,
Chelle
 
~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Chelle Reno
Austin Mission Consulting
(210) 478-7337 (c)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.sr.unh.edu/pipermail/ibex-maneuver-engineering/attachments/20110608/f22b56c2/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IBEX_ManeuverTimeline_Plan4-cr8a-print.pdf
Type: application/pdf
Size: 156942 bytes
Desc: IBEX_ManeuverTimeline_Plan4-cr8a-print.pdf
Url : http://lists.sr.unh.edu/pipermail/ibex-maneuver-engineering/attachments/20110608/f22b56c2/IBEX_ManeuverTimeline_Plan4-cr8a-print-0001.pdf 


More information about the Ibex-maneuver-engineering mailing list