Guys,
Here are the planning files and ATS for Orbit# 377
Please respond to this email thread with questions and approvals
Approvals are required before 4 Aug 17 @1900 UTC
Note the following:
1.
Battery Balancing at PERIGEE
Orbit# 376 PERIGEE: Battery Balancing Commands
# 2017-08-14T15:28:36.693Z,Perigee,orbit:376
SetLongEclipseFlag TRUE $TIME=2017/08:14:15:00:00
SetLongEclipseFlag FALSE $TIME=2017/08:14:16:30:00
2.
Moon in Lo FOV Commands
# 2017-08-10T07:31:03.744Z,MoonInLoFovStart,orbit:376
# 2017-08-12T02:19:31.561Z,MoonInLoFovStop,orbit:376
3.
Star Tracker Image Dump
IBEX,USHI02,ADD,08/23/17,235,15:30:00,08/23/17,235,17:00:00,,LAHO 160K IBEX-3 Orbit# 377 Star Tracker Image Dump/Tracking Contact(14 Desc)
4.
Command Load Constraint Violation Report
IBEX_2017_226_o0377a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2017/08/23 15:28:00 UTC - 2017/08/23
17:02:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
* IBEX,USHI02,ADD,08/23/17,235,15:30:00,08/23/17,235,17:00:00,,LAHO 160K IBEX-3 Orbit# 377 Star Tracker Image Dump/Tracking Contact(14 Desc)*
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/08/15 01:25:44 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/08/18 22:52:01 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
Sr Systems Engineer
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802