All,
I approve the pre and post ATS for Orbit# 375.
Tim
From: Wesley, Sheral
Sent: Thursday, July 13, 2017 5:00 PM
To: David Heirtzler <dheirtzl@atlas.sr.unh.edu>; IBEX-FDG <IBEX.fdg@applieddefense.com>; IBEXOPS <IBEXOPS@gmail.com>; ISOC <isocops@lists.sr.unh.edu>; Ken Fairchild <fair-play@comcast.net>; Ken Fairchild <kwfairchild@gmail.com>; Lockwood, Robert <Robert.Lockwood@OrbitalATK.com>;
Nigel Angold <nigel.angold@nasa.gov>; Paul Janzen <paul.janzen@umontana.edu>; Perry, Timothy <Timothy.Perry@OrbitalATK.com>; Tyler, Ryan <Ryan.Tyler@OrbitalATK.com>; Wesley, Sheral <Sheral.Wesley@OrbitalATK.com>
Subject: IBEX ORbit# 375 ATS Approval (27 Jul 17 - 5 Aug 17)
Guys,
Here are the planning files and ATS for Orbit# 375.
I have broken the ATS into two parts .
V001 ATS is Pre-Eclipse and V002 is Post-Eclipse
Please respond to this email thread with comments, questions and approvals
Approvals are required before 17 July 17 @ 1800 UTC.
Note the following:
1.
Long Eclipse
2017-08-02T08:57:09.510Z,EclipseEntry,moderate:false,long:true,orbit:375
2017-08-02T13:54:40.702Z,EclipseExit,moderate:false,long:true,orbit:375
2.
Command Load Constraint Violation Report (CCVR)
IBEX_2017_208_o0375a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2017/08/01 11:58:00 UTC - 2017/08/01
13:32:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-006: Planned transmission at 2017/08/02 05:28:00 UTC - 2017/08/02
06:07:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 6180.000 seconds)
IBX-CLC-006: Planned transmission at 2017/08/02 07:28:00 UTC - 2017/08/02
08:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 6180.000 seconds)
IBX-CLC-006: Planned transmission at 2017/08/05 03:28:00 UTC - 2017/08/05
05:02:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-015: Battery charge falls below minimum from 2017/08/02 11:49:09 UTC -
2017/08/02 14:12:40 UTC. Lowest charge level is 0.000000
watt-minutes during this interval.
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/07/27 19:40:25 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/07/31 13:58:46 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
Sr Systems Engineer
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641