Guys,
Here are the planning files and ATS for Orbit# 375.
I have broken the ATS into two parts .
V001 ATS is Pre-Eclipse and V002 is Post-Eclipse
Please respond to this email thread with comments, questions and approvals
Approvals are required before 17 July 17 @ 1800 UTC.
Note the following:
1.
Long Eclipse
2017-08-02T08:57:09.510Z,EclipseEntry,moderate:false,long:true,orbit:375
2017-08-02T13:54:40.702Z,EclipseExit,moderate:false,long:true,orbit:375
2.
Command Load Constraint Violation Report (CCVR)
IBEX_2017_208_o0375a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2017/08/01 11:58:00 UTC - 2017/08/01
13:32:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-006: Planned transmission at 2017/08/02 05:28:00 UTC - 2017/08/02
06:07:00 UTC is followed by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 6180.000 seconds)
IBX-CLC-006: Planned transmission at 2017/08/02 07:28:00 UTC - 2017/08/02
08:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 6180.000 seconds)
IBX-CLC-006: Planned transmission at 2017/08/05 03:28:00 UTC - 2017/08/05
05:02:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-015: Battery charge falls below minimum from 2017/08/02 11:49:09 UTC -
2017/08/02 14:12:40 UTC. Lowest charge level is 0.000000
watt-minutes during this interval.
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/07/27 19:40:25 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/07/31 13:58:46 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
Sr Systems Engineer
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802