Guys,
I have included v002 of the ATS.
The 2nd contact at PERIGEE has been added manually because the 14re_asc crossing occurs during the contact.
Note the following:
1.
No Moon in Lo Commands
2017-06-30T13:13:19.576Z,MoonInLoFovStart,orbit:372
2017-06-30T15:21:21.940Z,MoonInLoFovStop,orbit:372
2017-07-03T12:22:23.178Z,MoonInLoFovStart,orbit:372
2017-07-05T10:21:18.258Z,MoonInLoFovStop,orbit:372
Per Orbit# 372 STF: # Commenting this moon end due to no previous ascending or moon start for # Moon (far at 56.7) in FOV session[1] ends:
#2017-07-05T06:44:04.000Z||CEU_LO_IF_STAR_ADJ 250
#2017-07-05T06:44:06.000Z||CEU_LO_PMT_LVL 800
Sheral R. Wesley
Sr Systems Engineer
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802
From: Wesley, Sheral
Sent: Friday, June 16, 2017 11:22 AM
To: David Heirtzler; IBEX-FDG; IBEXOPS; ISOC; Ken Fairchild; Ken Fairchild; Lockwood, Robert; Michelle Reno; Nigel Angold; Paul Janzen; Perry, Timothy; Tyler, Ryan; Wesley, Sheral
Subject: IBEX ORbit# 372 ATS Approval (30 Jun 17 - 9 Jul 17)
Guys,
Here are the planning files and ATS for Orbit# 372
Please respond to this email thread with questions and approvals
Approvals are required before 19 Jun 17 @1600 UTC
Note the following:
1.
Perigee Sun Maneuver
2017-07-08T14:26:14.000Z,ManeuverWindowStart,targetX:-0.2822951672731804,mvrDuration:900,targetZ:0.3818976860421977,targetY:0.8800361333092078,orbit:372
2017-07-08T14:26:14.000Z,SunMvrBegin,extendedProperty(targetY):0.8800361333092078,extendedProperty(targetX):-0.2822951672731804,extendedProperty(targetZ):0.3818976860421977,extendedProperty(mvrDuration):900,orbit:372
2017-07-08T14:41:14.000Z,SunMvrEnd,orbit:372
2017-07-08T14:56:16.000Z,ManeuverWindowEnd,orbit:372
2.
IBEX_Lo Magnetotail Table Load
IBEX,USAK01,ADD,06/30/17,181,12:15:00,06/30/17,181,13:15:00,,LAHO 160K IBEX-2 Orbit# 371 Tracking/MagnetoTail Contact(15 Asc)
3.
Command Load Constraint Violation Report
IBEX_2017_181_o0372a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/06/30 10:18:36 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/07/04 03:32:56 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
Sr Systems Engineer
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802