Guys,
Here are the planning files and ATS for Orbit# 362.
Please respond to this email thread with your comments and approvals
Approvals are required by 23 Mar 17 @1200 UTC
Note the following:
1.
PERIGEE Battery Balancing
2017-04-10T12:53:11.441Z,Perigee,orbit:362
SetLongEclipseFlag TRUE $TIME=2017/04:10:12:00:00
SetLongEclipseFlag FALSE $TIME=2017/04:10:13:30:00
2.
Moon in Lo FOV
2017-04-03T08:46:07.012Z,MoonInLoFovStart,orbit:362
2017-04-04T12:11:00.759Z,MoonInLoFovStop,orbit:362
3.
PERIGEE Sun Maneuver
2017-04-10T03:15:46.000Z,ManeuverWindowStart,,orbit:362
2017-04-10T03:15:46.000Z,SunMvrBegin,orbit:362
2017-04-10T03:30:46.000Z,SunMvrEnd,orbit:362
2017-04-10T03:45:48.000Z,ManeuverWindowEnd,orbit:362
4.
Command Load Constraint Violation Report
IBEX_2017_091_o0362a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/04/01 22:37:05 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2017/04/05 15:39:23 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
Sr Systems Engineer
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802