Hello,
Command Approval Checklist revision 16b attached. This includes command checks for APL contacts where we reset the SSR pointers.
Thanks,
Chelle
Hello All,
Attached is the updated Command Approval Checklist. Changes in Rev 16 are:
- No spin pulse protect enable/disable commands
- % valid threshold updates
- Corrected APL contact commands
- Added back the deleted text in the post-apogee maneuver PL mode commands
Please let me know if there are any additional changes needed.
Thanks,
Chelle
Guys,
Here are the planning files and ATS for Orbit# 329.
Please respond to this email thread with your comments/questions and approvals.
Approvals are required before 26 May 16 @1200 UTC
Note the following:
1. New IBEX Rote Change : % valid thresholds after inertial maneuver
% valid command is now: ACT_SetKFInputSelect STA_PCT_VALID,43,28,33,48
2. No ACT_SetSpinPulseProtectEnable commands
3. No Battery Balancing Commands
4. Moon in Lo FOV Commands
2016-06-11T23:13:15.986Z,MoonInLoFovStart,orbit:329
2016-06-12T22:58:19.195Z,MoonInLoFovStop,orbit:329
5. Command Load Constraint Violation Report
IBEX_2016_156_o0329a_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2016/06/14 03:43:00 UTC - 2016/06/14
05:17:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2016/06/05 08:45:16 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2016/06/09 06:54:03 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802