All,

    I approve the ATS for Orbit 327

       Tim

 

 

Timothy E.Perry

CRS, IBEX & OCO-2

Mission Operations

tim.perry@orbitalatk.com

Office (703) 406-5976

Cell (301) 606-1430

Corp Cell (571)-447-8977

cid:image001.jpg@01D04F4E.6B1BECE0

 

 

 

From: Wesley.Sheral
Sent: Wednesday, May 04, 2016 6:44 PM
To: David Heirtzler; IBEX-FDG; IBEXOPS; ISOC; Ken Fairchild; Lockwood.Robert; Michelle Reno; Nigel Angold; Paul Janzen; Perry.Tim; Tyler.Ryan; Wesley.Sheral
Subject: IBEX Orbit# 327 ATS Approval (17 May 16 - 26 May 16)

 

Guys,

Here are the planning files and ATS for Orbit# 327.

Please respond to this email thread with your comments and approvals

Approvals are required before 6 May 16 @ 1800 UTC

 

Note the following:

1.       No ACT_SetSpinPulseProtectEnable Enable commands

 

2.       Battery Balancing at PERIGEE

2016-05-26T18:20:00.446Z,Perigee,orbit:327

SetLongEclipseFlag TRUE $TIME=2016/05:26:18:00:00

SetLongEclipseFlag FALSE $TIME=2016/05:26:19:30:00

 

3.       IBEX_Hi Gain Test

Orbit# 327 APOGEE: IBEX_Hi Gain Test (05:23:04:00:36 - 05:23:08:15:41)

 

4.       Command Load Constraint Violation Report

IBEX_2016_138_o0327a_Recovery_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-006: Planned transmission at 2016/05/22 11:58:00 UTC - 2016/05/22

             13:02:00 UTC is followed by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 7680.000 seconds)

IBX-CLC-006: Planned transmission at 2016/05/22 14:58:00 UTC - 2016/05/22

             16:02:00 UTC is preceded by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 7680.000 seconds)

IBX-CLC-006: Planned transmission at 2016/05/26 23:58:00 UTC - 2016/05/27

             01:02:00 UTC is followed by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 7680.000 seconds)

IBX-CLC-006: Planned transmission at 2016/05/27 01:58:00 UTC - 2016/05/27

             03:02:00 UTC is preceded by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 7680.000 seconds)

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2016/05/17 21:43:26 UTC

IBX-CLC-016: No command to enable spin pulse protection was found after

             transition to science mode at 2016/05/22 05:08:04 UTC

 

*The contacts are extended to gather CSS Telemetry and set the CEU Spin Period*

* no ACT_SetSpinPulseProtectEnable Enable commands*

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

 

Sheral  R. Wesley

IBEX Mission OPS

CRS/CYGNUS Mission Planning

Bldg. 2   Room 1337

Office (703) 406-5641

Cell (202) 236-0802

cid:image001.jpg@01D04F6C.5A1C97F0