I just want to do it every X orbits. Right now that X is 3 orbits. After the ST is stable, we can reassess.
In version 3 please include the SSR Pointer Reset commands as well :
# Orbit# 326 PERIGEE: APL-18 SSR_Dump/Tracking Contact
@ECT_SetRelay stx,on $TIME=2016/05:17:20:58:00
@FMI_SetDownlink2K $TIME=2016/05:17:20:58:02
@FMI_SetBilevelOutputControlReg STXMODE_Strobe,ON $TIME=2016/05:17:20:58:04
@FMI_SetBilevelOutputControlReg COHERENT,ON $TIME=2016/05:17:20:58:06
@FMI_SetDownlink320K $TIME=2016/05:17:21:05:00
@CEU_SSR_DUMP_NEW $TIME=2016/05:17:21:10:00
@CEU_SSR_SET_WRT_PTR 6500 $TIME=2016/05:17:21:10:02
@CEU_SSR_SET_RD_PTR 6500 $TIME=2016/05:17:21:10:04
@ECT_SetRelay stx,off $TIME=2016/05:17:22:02:00
Can we get a version 3 with the corrected times?
@CEU_SSR_DUMP_NEW $TIME=2016/05:17:21:10:00
@ECT_SetRelay stx,off $TIME=2016/05:17:20:02:00
From: Wesley.Sheral
Sent: Wednesday, April 27, 2016 9:13 AM
To: Wesley.Sheral; David Heirtzler; IBEX-FDG; IBEXOPS; ISOC; Ken Fairchild; Lockwood.Robert; Michelle Reno; Nigel Angold; Paul Janzen; Perry.Tim; Tyler.Ryan
Subject: IBEX Orbit# 326 ATS Approval v002 (8 May 16 - 17 May 16)
Guys,
Here is v002 of the ATS for approval.
The APL contact times were corrected
Sheral R. Wesley
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802
From: Wesley.Sheral
Sent: Tuesday, April 26, 2016 3:26 AM
To: David Heirtzler; IBEX-FDG; IBEXOPS; ISOC; Ken Fairchild; Lockwood.Robert; Michelle Reno; Nigel Angold; Paul Janzen; Perry.Tim; Tyler.Ryan; Wesley.Sheral
Subject: IBEX Orbit# 326 ATS Approval (8 May 16 - 17 May 16)
Guys,
Here are the planning files and ATS for Orbit# 326.
Please respond to this email thread with your comments, and approvals
Approvals are required before 28 Apr 16 @1100 UTC.
Note the following:
1. No Battery Balancing commands
2. APL-18 SSR_Dump commands were manually inserted because they straddled the 14re ASC crossing time
3. Moon in Lo FOV Commands
2016-05-13T11:33:24.289Z,MoonInLoFovStart,orbit:326
2016-05-14T17:39:40.942Z,MoonInLoFovStop,orbit:326
4. No Ascending SetSpinPulseProtectEnable Enable Commands
5. Command Load Constraint Violation Report
IBEX_2016_129_o0326a_Recovery_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2016/05/17 04:28:00 UTC - 2016/05/17
06:02:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
*IBEX,AUWA01,ADD,05/17/16,138,04:30:00,05/17/16,138,06:00:00,,LAHO 64K IBEX Orbit# 326 Tracking Contact
* CSS and CEU Spin Period Contact
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2016/05/08 11:34:23 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2016/05/12 20:35:16 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802