Guys,
Here are the planning files and ATS for Orbit# 326.
Please respond to this email thread with your comments, and approvals
Approvals are required before 28 Apr 16 @1100 UTC.
Note the following:
1.
No Battery Balancing commands
2.
APL-18 SSR_Dump commands were manually inserted because they straddled the 14re ASC crossing time
3.
Moon in Lo FOV Commands
2016-05-13T11:33:24.289Z,MoonInLoFovStart,orbit:326
2016-05-14T17:39:40.942Z,MoonInLoFovStop,orbit:326
4.
No Ascending SetSpinPulseProtectEnable Enable Commands
5.
Command Load Constraint Violation Report
IBEX_2016_129_o0326a_Recovery_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2016/05/17 04:28:00 UTC - 2016/05/17
06:02:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
*IBEX,AUWA01,ADD,05/17/16,138,04:30:00,05/17/16,138,06:00:00,,LAHO 64K IBEX Orbit# 326 Tracking Contact
* CSS and CEU Spin Period Contact
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2016/05/08 11:34:23 UTC
IBX-CLC-016: No command to enable spin pulse protection was found after
transition to science mode at 2016/05/12 20:35:16 UTC
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802