The Perigee Contacts for Orbit# 321 were nominal for command/telemetry and the sun maneuver successful.
The SSR dump was not complete. The remaining Blocks will be dump during Perigee of Orbit# 322
1.
SSR_Dump.scr (New) (32806 Blks, 5444 remaining Blks)
VC2= 27444 with 0 errors
Sheral R. Wesley
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802