The Perigee Contacts for Orbit# 321 were nominal for command/telemetry and the sun maneuver successful.

The SSR dump was not complete. The remaining Blocks will be dump during Perigee of Orbit# 322

1.     SSR_Dump.scr (New) (32806 Blks, 5444 remaining Blks)

VC2= 27444 with 0 errors

 

Sheral  R. Wesley

IBEX Mission OPS

CRS/CYGNUS Mission Planning

Bldg. 2   Room 1337

Office (703) 406-5641

Cell (202) 236-0802

cid:image001.jpg@01D04F6C.5A1C97F0