Just pressed the wrong button and sent an approval for v001 of the orbit 319 ATS. Please disregard that. I was trying to save the email. We need a v002 with the
From: "Wesley.Sheral" <sheral.wesley@orbitalatk.com>
To: "Stephen Lutz" <stephen.lutz@applieddefense.com>, "David Heirtzler" <dheirtzl@atlas.sr.unh.edu>, "IBEX-FDG" <IBEX.fdg@applieddefense.com>, "IBEXOPS" <IBEXOPS@gmail.com>, "ISOC" <isocops@lists.sr.unh.edu>, "Ken Fairchild" <fair-play@comcast.net>, "Lockwood.Robert" <robert.lockwood@orbitalatk.com>, "Michelle Reno" <mreno@swri.edu>, "Nigel Angold" <nigel.angold@nasa.gov>, "Paul Janzen" <paul.janzen@umontana.edu>, "Perry.Tim" <tim.perry@orbitalatk.com>, "Tyler.Ryan" <ryan.tyler@orbitalatk.com>, "Wesley.Sheral" <sheral.wesley@orbitalatk.com>
Sent: Saturday, February 20, 2016 6:15:53 PM
Subject: IBEX Orbit# 319 ATS Approval
Guys,
Here are the planning files and ATS for Orbit# 319.
Comments and approvals are required before 24 Feb 16 @1200 UTC
Note the following:
1. Apogee and Perigee Sun Maneuvers
2. Perigee Battery Balancing
Orbit # 319 PERIGEE: Battery Balancing Commands
# 2016-03-14T01:58:28.407Z,Perigee,orbit:319
SetLongEclipseFlag TRUE $TIME=2016/03:14:01:00:00
SetLongEclipseFlag FALSE $TIME=2016/03:14:02:30:00
3. APL-18 Contact commands will be uploaded later
4. 1 hour contacts until we have recovered from Star Tracker Anomaly
5. Command Load Constraint Violation Report
IBEX_2016_065_o0319a_Recovery_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2016/03/05 12:55:00 UTC - 2016/03/10
15:28:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-006: Planned transmission at 2016/03/10 15:28:00 UTC - 2016/03/10
16:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 21840.000 seconds)
IBX-CLC-015: Battery charge falls below minimum from 2016/03/05 17:26:14 UTC -
2016/03/10 22:09:00 UTC. Lowest charge level is 0.000000
watt-minutes during this interval.
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802

------------------------------------------------------------------------------
Notice: This e-mail is intended solely for use of the individual or entity to which it is addressed and may contain information that is proprietary, privileged and exempt from disclosure under applicable law. If the reader is not the intended recipient or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. This communication may also contain data subject to U.S. export laws. If so, that data subject to the International Traffic in Arms Regulation cannot be disseminated, distributed or copied to foreign nationals, residing in the U.S. or abroad, absent the express prior approval of the U.S. Department of State. If you have received this communication in error, please notify the sender by reply e-mail and destroy the e-mail message and any physical copies made of the communication. Thank you.
********** **********