Guys,

  Here are the planning  files and ATS for Orbit# 319.

Comments and approvals are required before 24 Feb 16 @1200 UTC

 

Note the following:

1.       Apogee and Perigee Sun Maneuvers

2.       Perigee Battery Balancing

Orbit # 319 PERIGEE: Battery Balancing Commands

#  2016-03-14T01:58:28.407Z,Perigee,orbit:319

  SetLongEclipseFlag TRUE $TIME=2016/03:14:01:00:00

  SetLongEclipseFlag FALSE $TIME=2016/03:14:02:30:00

 

3.       APL-18 Contact commands will be uploaded later

4.       1 hour contacts until we have recovered from Star Tracker Anomaly

5.       Command Load Constraint Violation Report

IBEX_2016_065_o0319a_Recovery_v001.scr

 

==========================

HARD CONSTRAINT VIOLATIONS

==========================

NO VIOLATIONS.

 

==========================

SOFT CONSTRAINT VIOLATIONS

==========================

IBX-CLC-006: Planned transmission at 2016/03/05 12:55:00 UTC - 2016/03/10

             15:28:00 UTC exceeds the maximum contiguous transmission time of

             5400 seconds

IBX-CLC-006: Planned transmission at 2016/03/10 15:28:00 UTC - 2016/03/10

             16:32:00 UTC is preceded by one or more additional transmissions

             which, when combined, exceed the maximum transmission time of 5400

             seconds within a 18000-second window (total planned transmission

             time this window is 21840.000 seconds)

IBX-CLC-015: Battery charge falls below minimum from 2016/03/05 17:26:14 UTC -

             2016/03/10 22:09:00 UTC. Lowest charge level is 0.000000

             watt-minutes during this interval.

 

==============

OTHER MESSAGES

==============

NO MESSAGES.

 

 

Sheral  R. Wesley

IBEX Mission OPS

CRS/CYGNUS Mission Planning

Bldg. 2   Room 1337

Office (703) 406-5641

Cell (202) 236-0802

cid:image001.jpg@01D04F6C.5A1C97F0