Guys,
Here are the planning files and ATS for Orbit# 319.
Comments and approvals are required before 24 Feb 16 @1200 UTC
Note the following:
1.
Apogee and Perigee Sun Maneuvers
2.
Perigee Battery Balancing
Orbit # 319 PERIGEE: Battery Balancing Commands
# 2016-03-14T01:58:28.407Z,Perigee,orbit:319
SetLongEclipseFlag TRUE $TIME=2016/03:14:01:00:00
SetLongEclipseFlag FALSE $TIME=2016/03:14:02:30:00
3.
APL-18 Contact commands will be uploaded later
4.
1 hour contacts until we have recovered from Star Tracker Anomaly
5.
Command Load Constraint Violation Report
IBEX_2016_065_o0319a_Recovery_v001.scr
==========================
HARD CONSTRAINT VIOLATIONS
==========================
NO VIOLATIONS.
==========================
SOFT CONSTRAINT VIOLATIONS
==========================
IBX-CLC-006: Planned transmission at 2016/03/05 12:55:00 UTC - 2016/03/10
15:28:00 UTC exceeds the maximum contiguous transmission time of
5400 seconds
IBX-CLC-006: Planned transmission at 2016/03/10 15:28:00 UTC - 2016/03/10
16:32:00 UTC is preceded by one or more additional transmissions
which, when combined, exceed the maximum transmission time of 5400
seconds within a 18000-second window (total planned transmission
time this window is 21840.000 seconds)
IBX-CLC-015: Battery charge falls below minimum from 2016/03/05 17:26:14 UTC -
2016/03/10 22:09:00 UTC. Lowest charge level is 0.000000
watt-minutes during this interval.
==============
OTHER MESSAGES
==============
NO MESSAGES.
Sheral R. Wesley
IBEX Mission OPS
CRS/CYGNUS Mission Planning
Bldg. 2 Room 1337
Office (703) 406-5641
Cell (202) 236-0802